Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Lula Belle

A regular ISORA competitor will take on the marathon Round Britain and Ireland Race double handed class starting on Sunday 12th August, a feat that follows in the wake of Liam Coyne's National Yacht Club First 36.7 Lulu Belle that took double–handed honours in 2014. The Irish Sea racer Kuba Szymanski's Beneteau First 40.7, Polished Manx II is one of ten double handed entries for the race.

The 2018 Sevenstar sponsred race will feature a wide variety of yachts racing under the IRC rating rule as well as one design and open classes, such as IMOCA, Class40 and Multihulls. The majority of the fleet will race fully crewed, but with over 10 entries and expressions of interest for the IRC Two Handed Class, the race is expected to have a record entry for Two Handed challengers.

The first ever RORC Round Britain and Ireland race was held in 1976, but it was not until 2014 that a Two Handed Team successfully finished the race. In 2014, Liam Coyne's Irish First 36.7 Lulu Belle, racing with Brian Flahive won IRC Two Handed. Ian Hoddle's Rare was runner-up and the first team in the history of the race to complete the gruelling 1,800 nautical mile challenge. Hoddle will be back this year with a new boat, his Sun Fast 3600 Virgin Media Business, co-skippered by Ollie Wyatt.

"Our goal is to win the Sevenstar Round Britain and Ireland Race IRC Two Handed Class, and based on the close competition in the 2017 RORC season, the biggest challenge will be the intensity of an 1,800 mile match race over 9 to 12 days," commented Ian Hoddle. "We have learnt that a race is never won until the finish line is crossed. Hard won miles can disappear at any point and the complexity will push us to our physical and mental limits. The experience from the 2014 edition was fantastic; starting alongside some of the best boats and pro-crews on the planet, the RORC organisation, the media helicopters, and finally meeting my family after a tough race was very emotional."

Kuba Szymanski's Beneteau First 40.7 Polished Manx II will be flying the Polish flag in the Two Handed Class. The veteran skipper is a short-handed expert having completed the Round Ireland Yacht Race and the Rolex Fastnet Race on many occasions.

"Lulu Belle, the Two Handed winners in the last edition told us their epic story of the race and I know how good Liam Coyne and Brian Flahive are; they are our role models," says Szymanski. "To prepare for the race we will be racing and training as much as we can, maybe 10,000 miles. We will be confident of the boat and the crew, but the biggest challenge will be the weather."

Werner Landwehr's German Figaro II Dessert D'Alcyone will be racing Two Handed again having come third in 2014 and is one of the smallest boats competing. Richard Palmer's JPK 10.10 Jangada, class winner in the 2017 RORC Transatlantic Race is currently the smallest boat in the fleet and Ross Hobson's Pegasus Of Northumberland the largest. The British Open 50 took line honours for IRC Two Handed in the 2017 Rolex Fastnet Race.

Published in Rd Britain & Ireland

#RORCSRBI - Liam Coyne and his sailing partner Brian Flahive crossed the finish line at Cowes around lunchtime today on their plucky First 36.7 Lula Belle to claim sixth place overall in this year's Round Britain and Ireland Race. Writing from the relative comfort of the shore, Coyne shared with us the pair's final days of racing...

Day 11 started with a night approach to Scilies. We had a great run with the A5 kite down but the wind went forward and we arrived with the jib up.

The worst part of having only one kite left was when to use it. When we rounded the Scilly Islands we should have put kite up and done three or four jibes but we had a spreader stuck through the mail sail and A lot of dark night gybing with it and our last kite did not appeal.

We ended up sailing around the Scillies to Lands End with only the main sail up. It was torture watching Rare pass us and have to be so conservative but we wanted to finish.

At first sunrise we hoisted the A5 and kept it going for 24 hours to arrive at the Isle of Wight at 6am on day 13. Despite Brian sowing it three times and the flogging it got in the last 24 hours, it's amazing how that sail held.

We were lucky to arrive at St Catherine's Point with tide so had a nice easy finish.

I must say I was very appreciative of the crew of Rare, who we beat to second, to come back out to the finish line with their families on board to applaud us over the finish.

The harbour master were good enough to tow us the the marina where the RORC team met us with media and champagne. It was confirmed we won the IRC Two-Handed class and combined classes 3 and 4, and finished sixth overall.

We are overwhelmed with all the well-wishes and messages. It's amazing how many were following [the race]. Boats are now tied up and we have to start repairs. Still have a 450-mile trip home.

Certainly it's one of the toughest races ever but very doable, and I hope our success this year leads a lot of other smaller boats to do this challenge.

 

Published in Rd Britain & Ireland

#RORCSRBI - As of 10am BST this morning, Liam Coyne's Lula Belle was bearing down on the finish line just 8.4 nautical miles from Cowes at the end of a remarkable Round Britain and Ireland Race.

The First 36.7, skippered by Coyne and crewed by Brian Flahive, already has first place in the IRC Four and Two-Handed categories in the bag – topping Ian Hoddle's already-home Figaro II Rare for the latter after time correction – and is set to be confirmed as the sixth place finisher overall.

That would be the icing on an incredible achievement for the Irish pair, who survived days of fatigue and potentially race-ending gear failure to strive to the end.

As reported yesterday on Afloat.ie, German entry Varuna – owned by Jens Kellinghusen – was declared the overall winner under IRC of this year's Sevenstar Round Britain and Ireland Race.

Published in Rd Britain & Ireland

#rorcsrbi – Dublin offshore two handers Liam Coyne and Brian Flahive are heading for the finish line of the Round Britain & Ireland Race on Saturday even though they have had a series of gear failures over the last 72 hours. Now – on day 10 – their engine, used to power batteries, will not start. Coyne sent this latest update to Afloat.ie this morning:

"When we thought there was nothing else left to fail the engine now will not start. This will probably be last mail from race. We are conserving all power to get us home. We are still not giving up and we have wind, a compass and charts so we can still finish. We now have 435 nm approx left and we feel we can safely cover that. We will inform you if there are any other developments"

Meanwhile, Swish, skippered by Canadian Roderick Knowles, crossed the finish line of the 2014 Sevenstar Round Britain and Ireland Race off the Royal Yacht Squadron, Cowes at 04.06.49 BST on Wednesday 20th August 2014 with an elapsed time of 8 days, 19 hours, 06 minutes and 49 seconds. Subject to ratification by the World Speed Sailing Record Council, this breaks the previous World Record for Monohulls 40 feet and less, set by Concise 2 in 2010, by over 18 hours.

This will be the fifth World Record broken during the 2014 Sevenstar Round Britain and Ireland Race organised by the Royal Ocean Racing Club.

Yesterday afternoon Custom JV52, Haspa Hamburg, finished the race to claim second in IRC Zero.

At 0900 BST on Day 10 JV53 Bank von Bremen, skippered by Carol Smolawa, is just 18 miles from the finish and is expected to be the 12th yacht to finish the Sevenstar Round Britain and Ireland Race and claim third place in IRC Zero. In IRC One Hanse 53, Saga, skippered by Peter Hopps, passed the Fastnet Rock in the early hours of Wednesday morning 390 miles from the finish.

In IRC Two there is a tremendous battle between J/122, Relentless on Jellyfish, skippered by James George, and J/111, British Soldier, skippered by Phil Caswell. Relentless on Jellyfish is sixteen miles behind the Army Sailing Association's British Soldier but leads on handicap by just 50 minutes.

The Irish Two-Handed team, Liam Coyne and Brian Flahive racing First 36.7, Lula Belle, spoke with the RORC Media Team as they approached the Irish Coast on Tuesday evening. "We are just off County Mayo, were I was born," said Liam Coyne. "All is well on board but we only have the A5 kite left, the other two are trashed and the mainsheet track has come away from the deck but it is nothing a bit of Irish engineering couldn't solve, I just hope it holds out. We are determined to finish this race but being so close to home makes us really want to get on with it."

The British Two-Handed team, Ian Hoddle and Conrad Manning racing Figaro II, Rare, have increased their lead over the German Figaro team, Dessert D'Alcyone, skippered by Werner Landwehr with crew Heiner Eilers. Rare is now 45 miles ahead, a gain of 25 miles over the last 24 hours.

Published in Rd Britain & Ireland

#rorcsrbi – After more than a week at sea, Irish Two-Handed team, Liam Coyne and Brian Flahive racing First 36.7, Lula Belle, have had a fantastic 24 hour run, covering nearly 200 miles in the Round Britain and Ireland Race. Just 60 miles to go until Blackrock, the team will be welling up inside as they start to get a glimpse of the Irish coast during the day. Lula Belle is 620 miles (just under a full Round Ireland race distance) from the finish and their current estimated time of arrival in Cowes is midday on Saturday 23rd August. Lula Belle is currently leading the Two-Handed Class on the water and after time correction.

The British Two-Handed team, Ian Hoddle and Conrad Manning racing Figaro II, Rare, have covered 160 miles in the last 24 hours and have 700 miles to the finish. After Rare's pit-stop on the Isle of Lewis last night, the Two-Handed team have made a big gain. Werner Landwehr and Heiner Eilers racing two-up on their Figaro II, Dessert D'Alcyone, are just 19 miles behind Rare. This has created a fascinating battle at the back of the pack. Dessert D'Alcyone and Rare are both 32 feet in length and vying for the prize of the first 32 foot yacht to complete the race.

At 0800 this morning nine yachts were still racing. Ifan James, skipper of Stimpson 42 Palpatine, contacted the Royal Ocean Racing Club yesterday to retire from the race with all crew well. Palpatine left the Isle of Lewis in the early hours of Tuesday morning and is currently passing the Isle of Skye, east of the Outer Hebrides. A scenic sail past the stunning lochs of the West Coast of Scotland in good weather and dry clothes will be a dream compared to the rough conditions experienced over the last few days.

Roderick Knowles' Class40, Swish, rounded The Lizard just before dawn this morning. They are 150 miles from the finish and speeding along at over 8 knots, well inside world record pace for a yacht of 40ft or less. Swish is expected to finish the Sevenstar Round Britain and Ireland Race in the early hours of Wednesday morning (20th August).

Pride of Germany
Custom JV52, Haspa Hamburg skippered by Katrin Hilbert, is just 94 miles from the finish, 30 miles offshore south west of Portland Bill. The young crew are all members of the German yacht club, Hamburgischer Verein Seefahrt. Founded in 1903, the club's tradition is to encourage young people to take part in ocean racing. The vast majority of the crew is less than 25 years old. In 2010 the club's entry in the race, Norddeutsche Vermögen Hamburg, came 5th overall under IRC, taking just under 10 days to complete the course. For the 2014 race, Haspa Hamburg is currently 4th overall under IRC and should finish the race in under nine days.

BvB on board
Sent from on board Bank von Bremen to the race blog
Just 10 miles from the Scilly Isles with 237 miles to go, JV53 Bank von Bremen, skippered by Carol Smolawa, is crewed by members of the Segelkameradschaft das Wappen von Bremen (SKWB). Based in Bremen and founded in 1934, SKWB has about 700 members worldwide. It provides each member with the opportunity to use the club's own boats to race offshore and at national and international regattas.

Carol Smolawa sent in this message from the race course:
"After all the rough days, we have a wonderful sailing day and most important, we could dry our clothes! What a wonderful feeling to have dry boots and garments! Under gennaker we sail with 11 knots in sunny and warm conditions; who could not ask for more? Tomorrow morning we will see the Scilly Isles and then the final leg towards Cowes. We are all happy that we are competing in the Sevenstar Round Britain and Ireland Race. The boat and crew have no major incidences. Now we are giving it our best for the last leg to Cowes," writes Smolawa.

Jellyfish Goes West
J/122 Relentless on Jellyfish, skippered by James George, was positioned 30 miles off the west coast of Ireland last night, so far in the race only the Spanish Volvo Ocean 65, Team Campos, decided to go that far offshore. However, the move looks to be paying off. At St. Kilda, Relentless on Jellyfish was behind Hanse 53, Saga, skippered by Peter Hopps, and British Soldier, sailed by the Army Sailing Association. Relentless on Jellyfish seems to have benefited from more wind during the night and this morning has passed both Saga and British Soldier, moving into first position in IRC Two, just under two hours ahead of British Soldier.

 

Published in Rd Britain & Ireland
28 sailing boats, the biggest fleet asembled so far is entered for tomorrow's (Saturday) Dun Laoghaire – M2 Buoy – Dun Laoghaire race starting at 10 am. This is the eighth race of the ISORA series and it is organised in conjunction with the Royal Alfred Yacht Club. The start line will be located in Scotsman's Bay. An updated entry list was published last night and is available for download below.
Published in ISORA

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020