Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: j80

A local Limerick sailing team has emerged victorious in the 43rd annual Gortmore Bell Race, held on September 9th on Lough Derg.

The race is considered the longest inland sailing race in Ireland and attracted 18 entries from various sailing clubs throughout the region.

The race was closely contested, with the GoJoe team aboard the J80 racing yacht, ultimately winning the coveted trophy.

Iniscealtra Sailing Club's Gortmore Bell RaceIniscealtra Sailing Club's Gortmore Bell Race

The trophy win was a tribute to the memory of Joseph (Joe) Crowley, a friend to all aboard, with the team dedicating their win to him after his passing.

Despite light winds, the race lasted over six hours on a shortened course, with only 56 seconds separating the first and second-place teams, with Rayon De Lunec runner-up and Dexterity third.

The Iniscealtra Sailing Club at Mountshannon organised the Gortmore Bell race, which has become a highlight of the inland Irish sailing calendar. 

Published in Inland Waterways
Tagged under

The Royal Irish's Austin Kenny, Simon Redden and Austin Burke were the overall winners of the J80 class at Volvo Dun Laoghaire Regatta.

In an all-star Irish fleet, that included Clontarf's Pat O'Neill, the 2021 J80 World Bronze medalist, 12 boats came to the line for the seven-race series.

The Kenny crew finished the blustery four-day event on ten points with a scoresheet that included three race wins to be two points clear of Royal St George's Owen Laverty. 

Third was Laverty's clubmate Hugh Blaney on 15.

The 2023 regatta, the ninth edition of Ireland's largest regatta, concluded on Sunday with final races for most classes and a great festival of sailing across the waterfront and Dun Laoghaire town as four sailing clubs come together for the biennial event; Dun Laoghaire Motor Yacht Club, Royal Irish Yacht Club, Royal St. George Yacht Club and National Yacht Club.

Published in Volvo Regatta

The Irish National Sailing & Powerboat School is preparing for the arrival of eight J80 keelboats in January, growing capacity for training, group events and competition.

After carefully reviewing the requirements for the next phase of sail training, the team choose the J80 to accommodate 4 to 5 students with an instructor with the small cabin adding extra options not currently available to the school on the 1720s.

The fleet is replacing the school’s six-boat 1720 training fleet. Operations Manager Glyn Williams explains, “This significant investment in the future of our sail training fleet is designed to meet the increased demand for adult beginner and improver sailing that has been sustained since the pandemic. We’re excited to be able to accommodate even more students in 2023, but importantly expand our charter, racing and group events”.

The school is planning an expanded beginner training schedule, as well as new coastal sailing courses, race training courses and more cruising pathway programmes.

School principal Kenny Rumball explains that training is not the new fleet’s only focus “each boat will be maintained in a totally one-design format, allowing for race event charter as well as to act as a support fleet for the Irish Sailing League. It’s an exciting moment for the school and these boats will play their part in growing sailing participation”. Kenny Rumball is also keen to point out that this creates opportunities with six 1720s available on the market.

Upgrading the Fleet

The J80s replace the school’s six 1720 keelboats which are now available for sale. The school is particularly keen to support the growing U25 representation in the sport. Here’s a race-ready, well-maintained package that’s ideal for a U25 team. Each 1720 has it’s own road trailer and school Principal Kenny Rumball is delighted to offer a discounted sail package to U25 teams as part of his new partnership with UK Sailmakers Ireland.

The school’s maintenance team spent the week before Christmas getting all six boats winterised and ready on their trailers. They’re all available for viewing in the school’s Dun Laoghaire yard.

The school’s six 1720 keelboats are for saleThe school’s six 1720 keelboats are for sale

One Design Fleet

A key feature of the fleet is that they’ve all been operated together from new and are truly one design. This will continue in school service, with school maintenance lead Lorcan Tighe having developed an operating schedule that will see every detail from part renewal and line replacements to length of time afloat being evenly matched across each boat. The fleet will shortly be equipped with new sets of UK Sailmakers' sails.

The one design focus will allow for new services such as fleet charter for one design events as well as to expand the school’s group and corporate event programmes.

They’ll also serve as a support fleet to the recently launched Irish Sailing League with competitions beginning in the new year. The whole fleet has road trailers and can be moved to any point in the country in conjunction with the MarineServices.ie team.

Getting Afloat

The boats are currently being prepared for their journey to Ireland. The first boats of the fleet land in the middle of January and all are expected to be in by the end of the month.

Training programmes for beginners start in March and the team in Dun Laoghaire will be using the month of February to familiarise with their new fleet.

The new INSS J80 fleetThe new INSS J80 fleet

Published in INSS
Tagged under

Pat O’Neill of Howth and his Mojo J/80 team are well known for their success in major events across Europe. But taking on the J/80 Worlds in the class heartlands at Newport, Rhode Island was a challenge which raised the stakes by several notches, and then some. So much so, in fact, that some early success in the very international fleet was regarded as a flash in the pan. But they just kept on getting better, and though the leading American and Swedish crews stayed ahead of them right to the end to take first and second, it was third for Ireland at the conclusion of a hectic series.

Published in Sailor of the Month
Tagged under

When bad weather hampered the final stages of preparation for the J/80 Worlds at Newport, Rhode Island last week, the pessimists wondered if it was stretching things too far, in an Autumn of unsettled weather, to have racing scheduled right up to the prize-giving on Saturday evening, with
seemingly no option for an extra day if things went pear-shaped.

But as we now know, everything went very right indeed, so much so that Pat O'Neill of Howth YC and his team in third overall found themselves getting an extra cheer as the lead act in a lively show with the prizes going out in the 3,2,1 order, Swden taking silver and US on gold on the sort of evening that should conclude every major championship.

See vid of the prizegiving below

Published in J80
Tagged under

As reported in Afloat.ie, the showing by Pat O'Neill and his Howth crew in the J/80 Worlds at Newport, Rhode Island during the past five days seemed to be improving in tandem with the improvement with the weather, and having been there or thereabouts in the early races, he and his team
were very much totally there in third overall as the series concluded last night at the east Coast USA's renowned sailing Mecca.

Published in J80
Tagged under

Pat O'Neill of Howth is a seasoned international campaigner with his championship crew in the J/80 fleet. But until now, most of his successes overseas have been achieved on the European circuit. This week, however, Team O'Neill have made the Transatlantic hop to the J/Boat heartlands at Newport, Rhode island, where they've found that the reputation of New England as a place for gentle sailing in the Fall - unless there happens to be a hurricane about - doesn't always hold up, as there have been some rugged and not very warm conditions to contend with.

Despite that, the Howth team have been in there battling for a place on the podium, and though the two leaders - Glenn Dardon of US and Per Roman of Sweden - are veering towards being out on their own ahead overall after three races, the Irish boat has put in a steady scoreline of 9, 6 and 4 - it's certainly trending in the right direction - to be,fifth overall, with more racing scheduled for today (Friday), and the series concluding tomorrow (8th October)

 J/80 Worlds results J/80 Worlds results

Published in J80
Tagged under

Overall Sportboat division leader Jonathan Craig's J80 George 7 won last Tuesday night's DBSC AIB race on Dublin Bay

Winds were six knots from the southeast, giving a spinnaker start for the mixed cruiser fleet from the DBSC Hut on the West Pier. 

The Race Officer was Jim Dolan. 

Second in race 13 of the series was Sam Webb's Jay-Z.

Dinghy racing was held on Scotsman's Bay where there was a five-boat turnout of Fireballs ahead of this month's World Championships on Lough Derg.

Leading Fireballer Neil Colin of the DMYC won the first of two races with Owen Sinnott taking the second.

Full DBSC results across all divisions are below.

Published in DBSC
Tagged under

Cadets and Young Ordinary members of Howth Yacht Club who are looking for a way to flex their competitive muscles can take to the water for weekly Pico team racing from 6pm this Friday 6 May.

Non-members are also welcome to round out the teams, which will be given a club Pico to race in as well as a reserved spot in The Light House pergola for race afters. For details see the Quest Howth website HERE.

But it’s not only Friday night lights at HYC, as Thursdays will also come alive this month with sessions for sharpening sailing skills delivered by a fully qualified Irish Sailing keelboat instructors in the club’s J80s.

The course runs for three weeks from next Thursday 12 May, from 6.30pm to 9pm and Quest has details HERE.

HYC notes that the last such course was equal parts sailing and socialising, perfect for easing into the summer season.

Published in Howth YC
Tagged under

After their first overall in the 2021 J/80 Danish Opens which acted as the preliminary for the upcoming Worlds at the same venue, Pat O’Neill of Howth and his crew knew the stakes would be much higher in the big one, as the Royal Danish YC is a J/80 magnet attracting a Worlds fleet in which getting into the top ten would be a major achievement. But they managed that - in fact, they were well clear of ten, finishing overall at sixth. The crew were Pat O’Neill, Shane Hughes, Ryan Glynn and Steve Ryan.

Published in Howth YC
Tagged under
Page 1 of 4

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020