Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Navy

#AoifeDonation - On the margins of an EU Defence Ministers informal meeting in Riga, Latvia, Minister for Defence, Mr. Simon Coveney, T.D. met Mr. Carmelo Abela, Minister for Home Affairs and National Security of Malta on Wednesday. 

According to the Gozo News, as well as discussing the EU Defence agenda, the Ministers reviewed the continuing cooperation between Malta and the Republic of Ireland on Defence matters.

This included the training of Maltese personnel in Ireland and future potential operations cooperation, building on the successful joint training team Malta and Ireland provided to the EU Training Mission in Somalia. The Minister agreed to explore further prospects for cooperation.

In this context the Ministers agreed to transfer ownership of the LÉ Aoife to the Maltese Armed Forces. The LÉ Aoife (P22) was decommissioned as previously reported on Afloat.ie last month following 35 years of operational service.

While the vessel is no longer viable for use in Irish waters it is ideally suited to address a pressing short-term shortfall in the naval capacity of Malta.

To read more as to the reasons to transfer the former Irish OPV to the Mediterranean, click the report HERE. 

Published in Navy

#FactoryTrawlers –L.E. Samuel Beckett (P61) the newest Naval Service OPV has according to RTE News detained two British-registered factory trawlers for alleged breaches of fisheries legislation today.

The trawlers were detained in a joint operation with the Sea Fisheries Protection Agency, 30 miles west of the Blasket Islands. The trawlers were fishing for pelagic species, such as mackerel.

LE Samuel Beckett is the Naval Service's newest ship and the trawlers are among the biggest vessels boarded by the Naval Service over the past year, each being 55 metres long.

Both trawlers are being escorted to Cobh, Co Cork and are due to arrive Thursday evening.

LE Samuel Beckett was commissioned for service in May 2014 as previously reported on Afloat.ie with coverage of her first patrol following her naming ceremony in Dublin Dublin Port.

Published in Navy

#Decommissioned – Naval Service OPV LÉ Aoife (P22), the longest-serving vessel in the fleet has been decommissioned at a special ceremony yesterday in Waterford City, reports RTE News.

In 35 years of service to the State she travelled in excess of 600,000 nautical miles, an equivalent of circumnavigating the globe 28 times, and her crew has boarded over 4,700 vessels at sea and detained over 440 fishing vessels.

During her service L.É Aoife was involved in numerous successful operations, primarily involving her role as a fishery protection vessel, but also search and rescue missions, most notably, the recovery in 1985 of the black box from Air India Flight 182 off the south west coast.

She departed Dublin Port on a farewell call during the week to her adopted homeport where the decommissioning ceremony took place. For more coverage by RTE click HERE.

Afloat.ie adds like her predecessor, L.E. Emer (P21) sold at auction in 2013, they were deployed on re-supply missions to Irish troops serving overseas with the United Nations in particular Lebanon.

The second of a trio of 'Emer' class offshore patrol vessels (OPV) she was built by Verolme Cork Dockyard and each of the 65m OPV's had a crew compliment of 46 (5 officers).

Now that the 'Aoife' has bowed out this leaves L.E. Aisling (P23) as the surviving sister to soldier on in the current reduced fleet of seven ships.

A pair of replacement newbuilds of the OPV90 'Beckett' class are on contract from Babcock Marine in the UK.

A date for Aoife's auction has yet to be confirmed. Her successor James Joyce is due for delivery in March this year.

The final and as yet to be announced name for the third newbuild is to enter service in 2016.

Published in Navy

#FarewellDublin – Naval Service OPV L.É. Aoife (P22) departed Cork Harbour to make an overnight final farewell visit to Dublin Port before the OPV's decommissioning in Waterford this Saturday, writes Jehan Ashmore.

Her arrival to the capital close to last midnight had echoed that of leadship offshore patrol vessel sister, L.É. Emer (P21) which also berthed on the Liffey in 2013. She was sold at auction in 2013 to Nigerian interests.

Unlike her predecessor's Dublin farewell visit, L.É. Aoife in comparison made a shorter call.

The call was less than 24 hours and in which saw the 65m OPV berth at Sir John Rogerson's Quay. No doubt the historic naval occasion was marked to highlight a career spanning 35 years since her entry into service during November 1979.

At lunchtime L.E. Aoife departed the port and also bid Dublin Bay farewell for the last time in blustery conditions.

She set a course to pass Dalkey Island. From offshore of that coastal suburb and the Muglins Lighthouse, she continued on the coastal shipping lane bound for the south-eastern inland port.

Waterford City is the adopted homeport of L.É. Aoife and as reported yesterday, the Suir will set an appropriate scene for Saturday's afternoon decommissioning ceremony.

Published in Navy

#Decommission - L.É Aoife (P22), the Naval Service's oldest vessel as previously reported on Afloat.ie is on her last patrol before decommissioning with a date now confirmed for next Saturday 31 January, writes Jehan Ashmore.

Waterford City is where the Verolme Cork Dockyard built offshore patrol vessel (OPV) will be decommissioned ceremonially. The choice of location is apt given that L.É Aoife's adopted homeport is that of the inland south-eastern city-port.

She was launched in 1978 following leadship class 'Emer' an improved version of L.É Deirdre, long since sold. The 65m OPV was named Aoife, stepmother to the children of Lir, whom she turned into swans. She entered the Naval Service when commissioned in November 1979.

A timeframe, for the OPV's disposal through a public auction (if not previously sold) remains to be confirmed according to the Department of Defence spokesperson. However, the auctioneer's website still suggests otherwise with an auction date to be held sometime in February, for details and further updates, click HERE.

Yesterday, L.É Aoife departed Cork Harbour from where the navy's pair of coastal patrol vessels CPV's as reported on Afloat.ie have been out of service due to work to remove asbestos.

As for the direct replacement of L.É Aoife, newbuild, James Joyce is understood to be scheduled to carry out sea acceptance trials in mid-February.

She is the second of a trio of OPV90 class 'Beckett' newbuilds totalling €162m that have been ordered in a contract to Babcock Marine's Devon shipyard in Appledore.

Published in Navy

#Asbestos- A Department of Defence spokesperson has confirmed to Afloat.ie, that the Naval Service pair of coastal patrol vessels (CPV) have been cleared of airborne asbestos and that the dangerous material was in engine room spaces, writes Jehan Ashmore.

As previously reported on Afloat.ie, the hazardous asbestos was discovered last year on board the CPV L.É Ciara (P42), which led to claims over health concerns to her crew and civilians workers.

The overall cost of the asbestos clearance which includes her sister L.É Orla (P41) is according to the Department to be in the region of €350,000 and not the speculated €1m as reported by Ships Monthly. 

The sisters were given the all-clear for asbestos back in 2000, following a survey conducted by a now defunct consultancy firm. 

In addition according to the UK publication, the asbestos in the engine room was used for lagging purposes by shipbuildersin 1984, Hall Russell & Co of Aberdeen (since closed) which completed the pair for the Royal Navy as part of a larger order. 

Four years later the 'Peacock' class twins that served the RN's Hong Kong Patrol Squadron where transferred to the Naval Service in 1988. That same year, I recall making a visit to board the CPVs which had recently arrived in the naval basin in Cork Harbour, where they moored abreast. 

In the following year, An Taoiseach Charles J. Haughey officially commissioned them into service. 

The Department of Defence have also informed Afloat.ie that the 'Orla' the former HMS Swift (P241) and 'Ciara' as the Swallow (P242) are currently having remedial work done on the funnels, cranes and air-handling units.

In addition the CPV's have undergone a "normal" refit work, which was carried out at Cork Dockyard and the department added to Afloat.ie, that the maintenance dry-docking was scheduled before the asbestos issue arose.

The vessels are also understood to have returned today (or early February) to the Naval Base on Haulbowline Island, from where further work is to continue.

At present, L.É Orla is scheduled to undergo sea acceptance testing in mid-February and it is expected that L.É Ciara will follow suit when available in March.

Published in Navy

#EliteDiving - As the country was battening down the hatches and ducking for cover this week, 10 hardy hopefuls took to the icy waters of Cork harbour, writes The Irish Mirror.

Standing to attention in gale force winds on Haulbowline Pier, this wasn't some cheap TV reality series designed to make us all feel fat.

There were no camera-friendly emotional breakdowns or interesting back stories.

No, these are the elite seamen vying for a coveted place on the Naval Services Diving Section.

What awaits those who succeed is not fame and fortune. Instead they will be expected to leave important family events at a moment's notice to recover bodies or tackle dangerous underwater bombs.

Each year around 50 people apply and roughly 15 of these are selected for the gruelling 11-week course.

For much more on this story, click HERE.

Published in Navy

#OPVJamesJoyce –  L.É. Aoife (P22) is on her last patrol before decommissioning and direct replacement newbuild, James Joyce is scheduled to carry out sea acceptance trials in mid-February, writes Jehan Ashmore.

According to the Department of Defence, should the second OPV90 ‘Beckett’ class proceed with sea-trials as scheduled, the newest addition to the Naval Service should make her delivery voyage to Irish waters in March.

The Department added that the formal commissioning date for the £54m offshore patrol vessel will be arranged when the ship arrives in Ireland. She is 90m in length, with a top speed of 23 knots and will have a range of 6,000 nautical miles.

As Afloat.ie previously reported, her sister leadship, L.E. Beckett (P61) undertook sea trials in the Bristol Channel prior to her delivery voyage with a first arrival to Cork Harbour last April. 

James Joyce was floated-out in November from the shipbuilding hall of Babcock Marine & Technology. The yard is located on the banks of the River Torridge, Appledore in north Devon.

She is to be followed by a third sister in which no name has been chosen so far. This final OPV90 is to enter service in 2016.

 

Published in Navy

,#FinalPatrol - L.É. Aoife (P22) the oldest Naval Service vessel is currently on her final patrol before she bows out of her career, which is expected to end within the final week of January, writes Jehan Ashmore.

Afloat.ie has contacted the Department of Defence which at this stage cannot confirm details of her official decommissioning. A Naval Service source, however, suggests that she may be decommissioned ceremonially also later this month, in Waterford, her adopted homeport.

Following that, a timeframe for the OPV’s disposal by public auction (if not previously sold) is understood to be held in either late February or early March, though this remains to be confirmed.

The OPV built at Verolme Cork Dockyard is the second of a trio of 'Emer' class sisters. They were an improved version of the original ‘Deirdre’ class launched in 1972 and also completed by the same shipyard. 

As for the removal of her armaments, the Department of Defence said these matters are being considered as part of the decommissioning process.

Viewings of the L.É. Aoife, can be made strictly by appointment only, to contact Dominic J. Daly call on 087 2550486 and for further developments, click the auctioneer's website, HERE.

Directly replacing the veteran vessel is the OPV90 class newbuild, L.É. James Joyce, which as previously reported is the second of the trio of ‘Beckett’ class ordered from Babcock Marine.

She was floated-out last November at their shipyard facility in Appledore, north Devon.

 

Published in Navy

#NavalBoardings – More than 900 boarding's have been carried by the Naval Service so far in 2014.

In addition this year saw a total of 10 detentions for alleged infringements of fishing regulations during the 940 patrol days conducted by the fleet of eight vessels. Joining the fleet was newbuild OPV L.E. Samuel Beckett (P61) which entered service in May.

Infringements recorded during inspections on board a total of 31 fishing vessels ranged from incorrect boarding equipment to under recording of catch. These fishery infringements resulted in points being awarded against each vessel.

Such searches and detentions of vessels take place in a sea area that requires the Naval Service to patrols 1 million km2 of sea. The massive patrol zone equate to over twelve times the land mass of Ireland, representing 15% of Europe's fisheries.

Asides Irish and neighbouring UK fishing vessels boarded and inspected by the Naval Service, the following list of countries have also been with vessels from Belgium, Netherlands, France, Spain, Germany, Norway, Denmark, Russia, Lithuania, Faroe Islands, Portugal. Also fishing vessels from as far as Mauritania in west Africa are part of this international fleet.

As part of fishery duties the Naval Service operates the National Fisheries Monitoring Centre and strives hand in hand with the Sea Fisheries Protection Agency.

Combined these agencies are to safeguard and manage our rich fisheries for current and future generations' sustainable exploitation.

The Naval Service with the Air Corps assist the Ordnance Survey Ireland (OSI) in Base Lines Project to map Ireland's sovereign claim to the seas around our island for generations to come.

Published in Navy
Page 17 of 26

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.