Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Recruitment

Chefs in the Naval Service are at a critically low level and so it has been unable to fill a growing number of vacancies, despite a two-year recruitment campaign aimed at attracting professionals from the private sector.

Currently, the navy has 16 fewer chefs than it requires and this will shortly increase to 18, as two more have signalled their intention to leave the service.

This is putting added pressure on those left to feed sailors and fears have been raised it will become even more difficult to fill these posts because of a countrywide shortage of chefs in the private sector.

Despite the two-year campaign for so-called ‘Direct Entry’ recruitment, the Naval Service has not been able to get one single chef to come into its ranks from the private sector.

Setting up 'field kitchens' can be tricky for soldiers, but the job can sometimes be far more difficult for navy chefs when ships are out on patrols and they have to cook for the crew in gale-force conditions.

Irish Examiner reports on the crew crisis. 

Published in Navy

Stena Line has launched its first national recruitment campaign in a bid to fill up to 60 vacancies onboard its ships across its Irish Sea routes.

This is the first time Stena Line has launched a major recruitment campaign of this nature. The need to be prepared for expanded customer levels post-pandemic is driving the current recruitment process for different roles as part of its crews at sea.

The recruitment campaign entitled ‘A Life Less Ordinary’ is highlighting the benefits of life onboard ferries crossing the Irish Sea and the unique work/life balance on offer with 50% of time spent off*.

January is traditionally the time of the year when people tend to evaluate their career paths.

For more on how to apply can be viewed here. 

Published in Stena Line
Tagged under

The Minister for Defence and Foreign Affairs, Simon Coveney T.D has announced support for a Naval Service Recruitment drive.

Minister Coveney, having completed an overnight Naval Patrol from Dún Laoghaire Harbour on board LÉ George Bernard Shaw (P64) to witness first-hand the dedication of the Naval Service and enormous responsibility attached to the maritime service branch of the Defence Forces, has declared his support for the current recruitment drive.

Commencing today, 26th June and for the next week and a half, the Naval Service will launch a tailored recruitment drive targeted at potential inductees to tackle the current shortfall in personnel. As part of this initiative, over (this weekend of 26th-27th June), the Naval Service vessel LÉ Roisín (P51) will be berthed in Dublin Port (at Sir John Rogerson’s Quay), where a pop-up recruitment post will be established.

Mr Coveney said: “This Recruitment Campaign is one of a suite of measures. Other measures that I have introduced include the sea-going service commitment scheme and a tax credit, both specifically targeted for sea-going Naval Service personnel.”

He added “I would like to offer my congratulations to the Naval Service for your part in the Defence Forces receipt, only this week, of a Medal of Excellence from the Maritime Analysis and Operations Centre – Narcotics, MAOC-N, based in Lisbon.

Ireland plays an important role in supporting efforts to disrupt drug trafficking into Europe and I understand as recently as the start of June the Naval Service and other Irish authorities played a key part in a considerable seizure by Spanish authorities.

The Medal of Excellence is therefore a timely and appropriate acknowledgement of the Naval Service’s dedication and achievement, and a reminder of the wide variety of career opportunities available to naval recruits.”

Published in Navy

#navy - PDforra, the organisation representing enlisted personnel in the Defence Forces has said recruitment in the Naval Service has reached a new crisis point and the only way to solve it is with pay increases to retain personnel.

As BreakingNews reports, the latest figures obtained by PDforra show there were nearly 800 expressions of interest in the latest recruitment drive for the service.

However, PDforra president Mark Keane said that 50 were initially asked to attend for interviews and medical/fitness tests, but just six turned up to fill a recruit class that is supposed to be 48-strong.

He said on average nearly one-in-five inducted into recruit classes opt out before they are fully trained and more leave quickly afterwards because the pay is so poor.

For further reading on this story, click here.

Published in Navy

#NavalService - The Irish Examiner writes of a damning report that highlights the reduced calibre of recruits in the Defence Forces, concluding that some had severe learning difficulties, others were extremely unfit, and one had been arrested numerous times by gardaí.

Some officers within the Defence Forces have queried vetting procedures as the report claims they were unaware of that person’s past until it was pointed out by another recruit.

Garda vetting is not carried out in many cases before recruits are inducted into training. This is because of the need to speed up recruitment to replace the haemmorage of highly trained personnel who are leaving the Defence Forces for better pay and conditions in the private sector.

Garda vetting of recruits can take between three and six months to complete.

For more on the newspaper's story click here. 

Published in Navy

#Jobs - Howth Yacht Club is seeking to recruit a person for the position of Club Manager, a new position incorporating overall responsibility for the management of the club including administration, marine and hospitality.

Responsibilities for the Club Manager will include management of all facilities and activities, direct management of all staff, contract management and regulatory complacence, financial management and marketing. The Club Manager candidate will report to the General Committee of the HYC.

The ideal candidate will have a proven track record in senior management and have strong interpersonal skills.

The closing date for applications is Friday 18 January. A full job specification and details of how to apply are available at the Howth Yacht Club website HERE.

Published in Jobs

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.