Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Cattle Compliance

Livestock-ship ‘Sarah M’, which remains anchored and empty in the Waterford Estuary off Dunmore East, now appears set to ship cattle to Algeria by the end of this week.

A statement issued this morning by Emerald Isle Beef Producers (EIBF) declared that “the recent technical difficulties regarding the shipment of cattle to Algeria have now been ironed out”.

Stating that the Sarah M is “now scheduled to head to Algeria before the end of the week,” EIBF referred to a “stalemate” between the Department of Agriculture “and the shipping company as regards procedures to be followed for the shipment”.

As the Waterford News & Star previously reported, exporters Roundwood Park Livestock and Premium Livestock postponed the shipment of bulls and bullocks (from Belview-The Port of Waterford) last Friday as it didn’t have a “sufficient quantity of compliant animals for export assembled by then”.

A complication arose due to a difficulty with cattle not being administered a wormer at their farm of origin prior to their scheduled transport, which would have ensured that the required withdrawal period would have been fulfilled prior to slaughter in Algeria.

That this didn’t happen, in what would have been the vessel’s second recent sailing to north Africa, has led to the Sarah M’s sitting empty and moored in the Estuary in the interim.

More on the cattle-ship story reports the Waterford newspaper here. 

Published in Irish Ports

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.