Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Dublin Port Masterplan Public Consultation Process

The Dublin Port Company has announced today over 200 responses from a wide range of stakeholders in a report issued on the Masterplan Public Consultation Process.
The consultation process secured 222 formal responses from a range of important participants. Common themes emerged from the responses including:

The need to ensure that Dublin Port and Dublin City are integrated and that the Port "turns its face" to the City, by removing physical barriers to integration and encouraging more people to visit the Port or view the activities taking place in the Port.

Widespread acceptance that Dublin Port is a key part of national strategic infrastructure and plays a key role in the life of the City and the greater Dublin area.

The importance of facilitating international trade in Ireland.

Unanimous agreement that everything possible should be done to encourage and facilitate the increased presence of Cruise Ships in Dublin Port.

General agreement that DPC faces significant challenges in operating and growing the Port in light of the location of the Port alongside sensitive environmental zones.

A common view that DPC should fully exhaust all viable alternatives to meet the operating requirements of the Port before engaging in additional reclamation works.

Widespread recognition that the creation of new port facilities at Bremore or elsewhere was not likely in the medium term given the financial challenges facing such a project in light of current national capacity, the scale of the engineering project involved and current funding.

The process sought views from a wide circle of stakeholders whose views on the operations and future of the port are important. Community briefings attracted over 100 people from Clontarf, East Wall and Ringsend. A conference was attended by 140 key stakeholders, while additional briefings were held with 12 organisations and groups.

Commenting, Mr. Eamonn O'Reilly said: "The objective of growing Dublin Port to allow it to handle 60m tonnes by 2040 is generally regarded as a reasonable basis for long term planning of the port. We are delighted with the response to our consultation process to date and we will make every effort to respond to all inputs we have received.

The Masterplan will help drive our national competitiveness by planning responsibly for an efficient and effective infrastructure to underpin the trading needs of our economy into the future. We are very conscious of the challenge of doing this, while integrating well with the city of Dublin and its citizens and expanding in a responsible and environmentally friendly manner."

Arising from the Consultation Process and the responses to the Issues Paper, there are a number of additional reports and studies that will be considered in the context of finalising the production of the Masterplan and a number of further meetings will be arranged with specific stakeholders.

Published in Dublin Port

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.