Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Royal Canal

Waterways Ireland advises all users of the Barrow Navigation that a Dragon Boat regatta will take place in Emily Square, Athy, Co Kildare from 9am to 6pm this Sunday 1 May.

Elsewhere, users of the Royal Canal are advised that a kayaking and watersport event will take place in Mullingar Harbour from 9am to 3pm next Thursday 5 May.

Masters of other craft are requested to proceed at slow speed and with minimum wash and note any directions issued by the stewards at each event.

Published in Inland Waterways

Waterways Ireland advises masters and owners of vessels on the Royal Canal that Lock 45 in Cloondara, Co Longford is closed to navigation until further notice for emergency leakage repairs.

Navigation on this inland waterway between Lock 44 and Lock 45 will not be possible until at least Friday 6 May when works are expected to be completed.

Published in Inland Waterways

Waterways Ireland has issued notice that it plans to remove vessels in contravention of bye-laws from three of its inland waterways from early next month.

Vessels that appear abandoned or have no no permit (as per Bye Law 6(8), are doubled moored and/or causing obstruction (sunk) (Bye Law 27 (3)), or are deemed to be/likely to cause a hazard to navigation (Bye-Law 33(3)) will be removed from the Grand Canal, Royal Canal and Barrow Navigation from Wednesday 4 May.

Removed vessels may then be subsequently disposed of in accordance with Bye Law 34(2).

Affected vessels have been stickered where access allows and owners, where known, have been contacted, Waterways Ireland says.

Published in Inland Waterways

Waterways Ireland has provided an update for masters and owners regarding canal boat passage arrangements in and out of Dublin city for the 2022 boating season.

Movements in or out of the city on its inland waterways will continue to be organised by prior arrangement to take place as a single movement in one day.

Passage will be organised and assisted for craft if they have the valid permit(s) and arrangements in place with the Waterways Ireland inspectorate. Some flexibility may be required on dates/times of travel to align with staffing and other considerations.

In order to plan the necessary lock assistance for movements east of Lock 12 on either canal, masters are required to contact the Eastern Regional Office at [email protected] or +353 (0)1 868 0148 prior to making passage.

At time of making contact, masters should provide the following details:

  • Length, beam, water and air drafts of craft (provide approximates if don’t have exact dimensions)
  • Permit number and expiry date of current canal permit
  • Contact details for making arrangements

On the Grand Canal, a minimum of two days’ notice prior to intended passage must be given and, with the exception of pre-arranged events, a maximum of two boats per day will be taken through the locks, travelling either east or west.

Due to periodic anti-social activity along some of canal route into Dublin, boat passage will generally not be arranged in certain weather conditions and at weekends when less support is available. This can be planned for at time of making contact and suitable arrangements for passage made.

On the Royal Canal, repairs and upgrades continue to Spencer Dock Sea Lock, so boat passage (including Newcomen Bridge lifts) will be on a reduced schedule.

In addition, there will be no boat passages permitted through Locks 2 and 4 on Whitworth Road from next Tuesday 12 April for two weeks due to gate repair, gate measurement and associated works. Sections of towpath on the south side of the canal also require closure during this time.

Masters are asked to note that bridge lift dates are pre-set and as listed below, and normal restrictions will apply. Two weeks’ notice in advance of these is required; and lock assistance, bridge lift operation and sea lock passage will then be organised accordingly:

  • Sunday 1 May, 9am-1pm (Liffey Low Water at 0620, 1839)
  • Saturday 4 June, 9am-1pm (LW @ 0915)
  • Tuesday 21 June, 11am-1pm (LW @ 1156)

Masters and owners are also reminded to ensure that they have the following before making the passage through the city locks on either canal:

  • adequate fuel on board
  • competent and adequate crew to operate the boat and locks (minimum crew of 3)
  • a lock key on board their boat
  • mooring lines of adequate length to handle vessel through a lock (approx. 15m length)
  • no known mechanical problems with their boat

Waterways Ireland reserve the right to postpone passage to another day if all of these are not in place.

Lock passages can be arranged in the boating season from now until the end of October, subject to any other restrictions that may be advised by Notice from time to time.

Also note that aquatic weed is generally more prevalent as the season progresses which can hamper passage.

Boaters will be facilitated as far as practicable although Waterways Ireland cannot guarantee that passage will be possible on every planned date. Early contact will greatly assist planning and facilitate the making of the necessary arrangements.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Royal Canal that due to persisting mechanical issues with Begnagh Bridge that necessitate repairs, the lift bridge can only be operated manually on a limited fixed schedule until mid-June.

The dates of operation are approximately every two weeks apart, as follows:

  • Friday 15 April at 10am
  • Thursday 28 April at 10am
  • Friday 13 May at 10am
  • Friday 27 May at 10am
  • Friday 10 June at 10am
  • Friday 24 June at 10am

Prior notice must be given two days in advance to the water patroller in Clondra on 087 915 1400.

Published in Inland Waterways

Waterways Ireland wishes to notify users of the Royal Canal that leakage repair works are ongoing at The Downs, outside Mullingar in Co Westmeath, and will continue until Thursday 28 April. The inland waterway will remain closed to navigation at this location until that date.

Published in Inland Waterways

Waterways Ireland advises masters and owners of vessels of issues affecting navigation on the Shannon-Erne Waterway this week.

Following Storm Franklin, the Woodford River was completely blocked to navigation by two partially submerged fallen trees immediately upstream of Old Aghalane Bridge.

In addition, there are high-water levels in all areas of the waterway. Masters should consult with the water patrollers prior to undertaking a passage.

The by-pass current across the navigation on the lower side of Lock 15 is strong and could affect low powered vessels.

Air draft under bridges has been reduced as a result of the high-water levels and masters of craft are advised to navigate with additional caution in the vicinity of bridges.

Elsewhere, users of the Royal Canal towpath in the Maynooth area are advised that the section from Lock 13 at Deey Bridge to Pike Bridge east of Maynooth has been closed due to flooding from a blocked culvert.

The cross-border body for Ireland’s inland waterways says it is working with Kildare County Council to resolve the issue as soon as possible and apologises to users for any inconvenience this may cause.

Published in Inland Waterways

Waterways Ireland advises of a number of temporary closures and scheduled works across the inland waterways in the coming days.

On the Grand Canal, masters of vessels should note that there will be no boat passages permitted on the Nass Branch (NCB2) for six weeks from Monday 14 February to facilitate breast gate replacement and associated works.

On the Shannon Navigation, Athlone Lock will be closed to boat traffic from Wednesday 16 to Friday 18 February to allow for the relocation hydraulic and electrical services as part of recent flood relief works.

Further north, essential dredging works will see the closure of Portna Canal on the Lower Bann Navigation to boat traffic from Monday 14 to Monday 21 February.

And in Dublin, masters and users of the Royal Canal should note essential tree works taking place between the 12th Lock and Granard Bridge (Castleknock Road) from Monday 14 February.

These works are expected to last for 10 working days which may not be consecutive, weather and staff resources allowing. Vessel owners moored on the north band are asked to cooperate with the tree works contractor to access the bank area for tree removal.

While closure of the towpath is not foreseen, towpath users are asked to be mindful of the works ongoing.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Royal Canal that the summit level near Mullingar is closed to navigation with immediate effect until the end of February, in order to facilitate essential leakage repair works on the inland waterway.

Published in Inland Waterways

Christmas has arrived along the Royal Canal Greenway as a line-up of festive things to do and see at its multiple trailheads are announced.

In Kildare, visitors can veer off the greenway to experience a taste of Christmas with Festive Afternoon Tea at Carton House, available Thursdays to Sunday.

In Longford, those keen to kick start their New Year’s health resolutions early can hire a bike from the Midlands Cycle Hub in Cloondara or at Ballymahon Greenway Cycles to avail of seasonal special offers on bike hire over the December and Christmas holiday period.

Then unwind and enjoy festive entertainment after your Royal Canal visit with a performance of Longford’s Snow White Christmas Pantomime which is running at St Mel’s College from 20 December to 2 January.

Also not to be missed are Fiona Egan’s Festive Cookery Class (runs throughout December, booking required) and Longford’s Traditional Panto, which runs from 20 December to 2 January (book here).

If you’re in Westmeath, get into the festive spirit at Mullingar Arts Centre this Christmas with its extensive programme of festive fun events and performances for all the family.

Visitors seeking to stay awhile can find respite at popular accommodation options in Westmeath including the centrally located Newbury Hotel and the family-run Annebrook House Hotel, situated in the heart of Mullingar nearby and renowned locally for its annual breath-taking Christmas foyer display.

Refuel at one of Westmeath’s picturesque eateries. Nanny Quinn’s, located on the banks of the Royal Canal by Lock 18 at Thomastown Harbour, is a must-taste restaurant serving fresh, local home-cooked fare and is adorned with Christmas lights offering a charming festive experience.

And see Santa while you stop off in Westmeath at the Andean Alpacas Christmas Experience where you can explore the festive pathways, visit the elves and receive a gift from Saint Nick himself.

Your little elves can even post a letter to Santa in a special letterbox destined for the North Pole, feed the alpacas and site and have storytime with Mrs Claus.

Speaking about the events planned for the festive season, Sharon Lavin of Waterways Ireland said: “As Ireland’s longest greenway covering over 130kms across Kildare, Longford, Meath and Westmeath, the Royal Canal Greenway has plenty of activity happening this Christmas.

“There is an abundance of activities planned near our four main trailheads, whether you are in the mood for a festive feast or taking the whole family to see Santa, visitors can enjoy the seasonal beauty of the Royal Canal Greenway while still partaking in the festive events and activities along the way.”

Check out the Royal Canal Greenway on Facebook, Instagram or Twitter where more information about events is being added daily.

Published in Inland Waterways
Page 4 of 14

Galway Port & Harbour

Galway Bay is a large bay on the west coast of Ireland, between County Galway in the province of Connacht to the north and the Burren in County Clare in the province of Munster to the south. Galway city and port is located on the northeast side of the bay. The bay is about 50 kilometres (31 miles) long and from 10 kilometres (6.2 miles) to 30 kilometres (19 miles) in breadth.

The Aran Islands are to the west across the entrance and there are numerous small islands within the bay.

Galway Port FAQs

Galway was founded in the 13th century by the de Burgo family, and became an important seaport with sailing ships bearing wine imports and exports of fish, hides and wool.

Not as old as previously thought. Galway bay was once a series of lagoons, known as Loch Lurgan, plied by people in log canoes. Ancient tree stumps exposed by storms in 2010 have been dated back about 7,500 years.

It is about 660,000 tonnes as it is a tidal port.

Capt Brian Sheridan, who succeeded his late father, Capt Frank Sheridan

The dock gates open approximately two hours before high water and close at high water subject to ship movements on each tide.

The typical ship sizes are in the region of 4,000 to 6,000 tonnes

Turbines for about 14 wind projects have been imported in recent years, but the tonnage of these cargoes is light. A European industry report calculates that each turbine generates €10 million in locally generated revenue during construction and logistics/transport.

Yes, Iceland has selected Galway as European landing location for international telecommunications cables. Farice, a company wholly owned by the Icelandic Government, currently owns and operates two submarine cables linking Iceland to Northern Europe.

It is "very much a live project", Harbourmaster Capt Sheridan says, and the Port of Galway board is "awaiting the outcome of a Bord Pleanála determination", he says.

90% of the scrap steel is exported to Spain with the balance being shipped to Portugal. Since the pandemic, scrap steel is shipped to the Liverpool where it is either transhipped to larger ships bound for China.

It might look like silage, but in fact, its bales domestic and municipal waste, exported to Denmark where the waste is incinerated, and the heat is used in district heating of homes and schools. It is called RDF or Refuse Derived Fuel and has been exported out of Galway since 2013.

The new ferry is arriving at Galway Bay onboard the cargo ship SVENJA. The vessel is currently on passage to Belem, Brazil before making her way across the Atlantic to Galway.

Two Volvo round world races have selected Galway for the prestigious yacht race route. Some 10,000 people welcomed the boats in during its first stopover in 2009, when a festival was marked by stunning weather. It was also selected for the race finish in 2012. The Volvo has changed its name and is now known as the "Ocean Race". Capt Sheridan says that once port expansion and the re-urbanisation of the docklands is complete, the port will welcome the "ocean race, Clipper race, Tall Ships race, Small Ships Regatta and maybe the America's Cup right into the city centre...".

The pandemic was the reason why Seafest did not go ahead in Cork in 2020. Galway will welcome Seafest back after it calls to Waterford and Limerick, thus having been to all the Port cities.

© Afloat 2020