Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Stena Europe

#ferries - The Rosslare-Fishguard ferry Stena Europe is off service and is currently undergoing a significant three-month refit visit at a shipyard located outside Europe.

Last month Afloat monitored the Ireland-Wales ferry having left familiar waters when off Spain and prior to taking on bunkers in Gibraltar and entering the Meditteranean. According to Stena Line the ferry is at the Gemak Shipyard in Tuzla. The yard is located in the province of Istanbul, Turkey on the Asian side of the city. 

The 24,828 gross tonnage ferry which was introduced on the St. Georges Channel route in 2002 is scheduled to return late June 2019 and during the visit a number of upgrade projects will be completed.

One of the most significant projects to be undertaken includes modifications to the deckhead levels on the main vehicle deck to allow for the carriage of full-height trailers across the whole of the main vehicle deck. Prior to arrival at the Turkish shipyard, Stena Europe was restricted to carrying full-height trailers on its port side only.

Other works will include the renewal of the majority of the ship’s windows, engine and hull overhauls including blasting the whole hull to remove all the existing old paint work to improve fuel efficiency and the ships appearance.

Internally, the passenger stairwells will be revamped, a redesign of the Barista Coffee outlet, as well as upgrades to the passenger Information Desk and other decor improvements. During the refit period, the Stena Europe has been replaced by the Stena Nordica on the Rosslare-Fishguard service.

Ian Davies, Stena Line Trade Director (Irish Sea South) said: “Our ongoing ship refit programme is an important part of our business operation ensuring that our fleet operates to its maximum efficiently and is further evidence of Stena Line’s rolling investment programme for the region. The Stena Europe is an important part of our Irish Sea South fleet and we look forward to welcoming a revamped vessel back to our Rosslare-Fishguard service in the summer with the capacity to accommodate even more full-height trailers while still carrying up to 1, 400 passengers.

This is an important year for Stena Line on the Irish Sea as preparations are made to receive the first of its new generation E-Flexer series vessels, the Stena Estrid, which is scheduled to enter service on the Dublin to Holyhead route in early 2020, the first of three new E-Flexer vessels bound for the Irish Sea region..

Stena Line is the largest ferry operator on the Irish Sea, operating routes between Ireland and Britain, including Dublin to Holyhead, Belfast to Liverpool /Heysham and Belfast to Cairnryan. In addition a continental direct service to France between Rosslare and Cherbourg.

Published in Ferry

#FerryReturns – A ferry on the Stena Line Holyhead-Dublin Port had to return to Anglesey after reports of a fire on board.

Emergency services were called after smoke was spotted coming from a refrigeration unit on the car deck of the Holyhead to Dublin Stena Europe ferry. No fire was found and the Stena Europe was able to leave for Dublin. For more BBC North Wales reports.

Afloat.ie adds that the Stena Europe has docked in Dublin Port this afternoon having completed the delayed sailing from Wales.

Stena Europe normally operates the Rosslare-Fishguard route and yesterday the ferry made a repositioning voyage to Dublin Port.

The veteran ferry built in 1981 is covering Dublin-Holyhead sailings otherwise operated by Stena Nordica which went off service for dry-docking. The route's second ferry, Stena Adventurer maintains running on schedule.

Stena Europe is due to have an annual refit in Cammell Laird, Birkenhead. Currently there are no sailings between Rosslare-Fishguard until her return on 9 December. An interim replacement service from Rosslare is running instead to Pembroke Dock and this route is operated by Irish Ferries.

 

Published in Ferry

#MarineWildlife - BBC News has some incredible footage of a 'superpod' comprising hundreds of dolphins in the Irish Sea captured this week.

The video was shot by surprised researchers with the Wales-based Sea Trust on one of the groups routine survey expeditions between Fishguard and Rosslare on board the Stena Europe ferry.

Cliff Benson of the marine wildlife charity described the sea as "boiling" with dolphins just 10 miles off the Irish coast yesterday morning.

"They were just coming and coming. It was the last thing on earth I was expecting in the winter," he said. "We had at least 250 and that's a conservative estimate. I'm guessing there was as many as 500."

The incredible sight comes just a month after the researchers recorded what they called a "dolphin-fest" along the same route west of Tusker Rock, numbering more than a 100 dolphins and 26 porpoises.

BBC News has more on the story HERE - and more footage is available HERE via RTÉ News.

Published in Marine Wildlife

#FERRY NEWS - A Stena Line ferry was unable to dock in Rosslare last night after a collision with an Irish Ferries passenger craft in heavy winds.

TheJournal.ie reports that the Stena Europe ferry was attempting to dock at Rosslare Harbour after its arrival from Fishguard around 6pm when it made contact with the starboard bow of the Oscar Wilde, which was stationary in port.

RTÉ News says that neither vessel was badly damaged in the incident, but docking was postponed pending the departure of the Irish Ferries vessel, which was expected around 11.30pm last night.

More than 500 passengers and crew were on board the ferry at the time of the incident, which occurred amid gusts of up to 35 knots.

The return journey to Fishguard and this morning's Fishguard-Rosslare sailing were cancelled while an inspection of the vessel gets underway.

Published in Ferry

#FERRY NEWS - A commemoration plaque in memory to those who lost their lives when the Irish Sea passenger ferry S.S. Patrick (II) was attacked by a bomb from the Luftwaffe during WW2, is to be unveiled in Rosslare Europort next Wednesday.

The tragic attack in 1941 resulted in the 1,922 tonnes vessel sinking with the death of 30 people while the twin-screw steam turbine powered vessel was on passage off the Welsh coast. The ship built in 1930 was launched from the Alexander Stephen & Sons Glasgow (Yard No 525) Glasgow, and she commissioned to serve the St. Georges's channel route between Rosslare and Fishguard.

She had been targeted by a German machine gunner the previous year even though it was not a military vessel and the reasons for its attack have remained a mystery to this day.

Diane Poole OBE, Head of PR and Communications at Stena Line said, "The ship that sank was owned by the Fishguard and Rosslare Railways and Harbours Company (FRRHC), of whom Stena Line along with Irish Rail/Rosslare Europort are descendants.

She added: "Despite the deaths and the trauma attached to the event, the memory of the ship and those who went down with her has largely been lost. There has never been a true commemoration in Ireland of the disaster – until now."

For further information about the tragedy click HERE and a documentary recorded for RTE Radio On can be listened to by clicking this LINK.

The current ferry operating the route is the Stena Europe (1981/24,828grt) which has maintained the route for the last decade. Sailings on the summer schedule will not be boosted by the fast-ferry craft, Stena Lynx III which was sold last year to serve new South Korean owners.

Published in Ferry
With the recent closure of Stena Line fast-ferry services from Dun Laoghaire and Rosslare, this leaves just four such services operating this winter between Ireland and Britain. By November only half of these services will be running on routes out of Dublin and Larne, writes Jehan Ashmore.
Currently three of these four services are employed on North Channel routes. P&O Ferries operate their fast-craft Express (1998/5,902 grt) on the one-hour route to Cairnryan which is also served by conventional ferry sisters that take two-hours. Since March the fast-ferry also joined the freight-ferry on the Troon route for the start of seasonal summer sailings which are to end on 3rd October.

The third service between Belfast-Stranraer is in the hands of rivals Stena Line which maintain the HSS Stena Voyager (1996/19,638 grt) on sailings but only to around mid-November. She will be replaced by conventional sister-ships which will be introduced on the North Channel's newest port when services switch from Stranraer to a new terminal close to Cairnryan.

Finally the fourth fast-ferry is Irish Ferries marketed 'Dublin Swift' service which runs on the Dublin-Holyhead route served by Jonathan Swift (1999/5,989 grt). The craft built by Austal in Fremantle, operates alongside the conventional cruise-ferry Ulysses.

Stena Line's decision to terminate HSS Stena Explorer sailings between Dun Laoghaire-Holyhead this day last week follows fast-ferry Stena Lynx III's end-of-season Rosslare-Fishguard sailings earlier this month.

From next year, Dun Laoghaire-Holyhead sailings are to be seasonal-only and according to Stena Line they hope to resume fast-ferry sailings in April or May though no exact date has been set. Unlike the central corridor route which was entirely dependent on HSS operations, the Rosslare-Fishguard route remains operating year-round with the conventional ferry Stena Europe.

As a result of the discontinued fast-ferries, the HSS Stena Explorer is now spending a lay-up period in the Welsh port for the winter. The smaller Stena Lynx III is also 'wintering' but in on the opposite side of the Irish Sea in Dun Laoghaire, where the vessel has done so in previous years.

The lay-up of both fast-ferries in Dun Laoghaire and Holyhead is ironic considering that neither ports' are connected by the very craft that used to share sailing rosters in recent years. In addition the wintering of these catamaran craft is the first time that this has occurred since the pioneering Stena Sea Lynx fast-ferry launched such sailings in 1993.

This first 'Lynx' provided seasonal sailings on the route with conventional car-ferry Stena Hibernia, the former St. Columba, custom-built in 1977 for Sealink /British Rail. She was given a second name under Stena ownership, the Stena Adventurer and remained on the 57 nautical-mile route until replaced in 1996 by the year-round operated HSS Stena Explorer.

Apart from cross-channel fast-ferry services, the Isle of Man is served by the Isle of Man Steam Packet Co. Ltd's routes linking the islands capital Douglas with Belfast, Dublin, Heysham and Liverpool (Birkenhead) in the winter. These routes include seasonal services which are operated by a combination of conventional tonnage using Ben-My-Chree and fast-ferry Manannan (1998/5,089grt), a former US Navy vessel, to read more click HERE. For sailing schedules, vessel type deployed on route and for fares click HERE.

Published in Ferry
Holidaymakers now have the added option of  fast-ferry sailings on Stena Line's Rosslare-Fishguard port route which is to resume tomorrow, writes Jehan Ashmore.
The high season service is operated by the fast-ferry Stena Lynx III which is marketed as the Stena 'Express' . The summertime service runs between 1 July - 4 September and the fast-ferry is scheduled to take 120 minutes for the crossing.
Stena Lynx III has a capacity for over 600 passengers and 120-cars, to see a virtual tour of the wave-piercing catamaran craft click HERE. Measuring 81m long the 4,113 gross tonnes craft was built in 1996 by fast-ferry specialists InCat in Hobart, Tasmania. In recent years she maintained sailings between Dun Laoghaire-Holyhead when the HSS Stena Explorer was temporily taken off service.

In addition to the 'Express' service the St. Georges Channel route is served by the year-round operated conventional ferry, Stena Europe (1981/24,828 grt). The 1,386 passenger / 564-vehicle ferry recently underwent a £2m refurbishment and takes a more leisurely passage time of 3 hours 30 minutes.

For information on both fast-ferry and conventional ferry sailing schedules click HERE.

Published in Ferry

Fast-ferry Stena Lynx III departed Dun Laoghaire for Fishguard Harbour on a repositioning voyage today, writes Jehan Ashmore.

The 80m craft built in Hobart, Tasmania is due to dock at the Pembrokeshire port this afternoon in advance of seasonal sailings on Stena Line's Fishguard-Rosslare.The Stena 'Express' fast-ferry service is to resume in just over a fortnight's time. Sailings are scheduled to a daily single round trip between 1 July-4 September.

The 627 passenger / 120 car capacity fast-ferry will operate in tandem with the year-round operated conventional ferry-service served by the Stena Europe. Passage times are 120 minutes for the fast-ferry service while the Stena Europe takes 3 hours 30 minutes to sail across the St. Georges Channel.

In the same week that the fast-ferry takes up summer sailings from Fishguard, the small French flagged cruiseship Le Diament is to make the first of three calls in July and once in August.

The motoryacht-like vessel which can accommodate 226 passengers is the first cruise caller of the season and is run by the only French-owned cruise operator Compagnie De Iles Du Ponant.

Published in Ferry
4th April 2011

Stena's Southern Sailings

Sailings on Stena Line's Rosslare-Fishguard port route remain for freight-users only until the passenger ferry returns from essential maintenance this week, writes Jehan Ashmore.
The passenger ferry Stena Europe is currently in dry-dock at the A&P Group's Falmouth facility and is scheduled to resume normal service with the first sailing at 14.30hrs from Fishguard on Thursday 7th April. The corresponding first outbound sailing from Rosslare is on the same day with the 21.15hrs sailing.

In the meantime freight-only ferry Stena Seafarer is operating the St. Georges Channel route having arrived at Rosslare on a repositioning voyage from Belfast on 29th March.

Stena Seafarer (1975 / 10,957grt) was one of a trio of freight-ferry sisters that served the Larne-Fleetwood port route until its closure in December. Like her sisters Stena Leader (1975 / 12,879grt) and Stena Pioneer (1975 / 14,426grt) they were built at the West German shipyard of J.J. Sietas in Hamburg.

Stena Seafarer's sisters remain laid-up in Belfast and with each vessel over 35 years in service it would seem likely there are nearing the end of their careers, at least on the Irish Sea.  

To provide additional passenger capacity the Stena 'Express' fast-ferry service will return to the southern corridor route between 1 July-4 September. The high-season sailings as usual will be operated by the InCat built Stena Lynx III which is to operate a daily single round trip in tandem with Stena Europe.

Published in Ferry
With just over a fortnight to go to resumption of Stena Line's Dun Laoghaire-Holyhead fast-craft sailings on 1 April, the route to Wales is to see the larger HSS Stena Explorer return instead of Stena Lynx III, writes Jehan Ashmore.
It was originally planned that the 4,113grt 'Lynx' craft would start the season while the 19,638grt HSS (High Speed Service) fast-craft would take over in June for the summer months.

According to Stena Line over 70% of its passengers business is carried by the HSS Stena Explorer in the high season. It is felt that the 1996 Finnish built fast-craft is better suited for the service due to a loyal customer base which was reflected by repeat bookings and their preference of the HSS craft on the 120 minute (2 hour) route.

A daily single round trip is scheduled with sailings from Dun Laoghaire to Holyhead departing at 13:15hrs. The corresponding sailing from the Anglesey port departs at 10.00hrs and arrives at the Irish port at 12 noon. Sailings will operate through the summer until 13 September.

From there on Stena will make a decision as to its continuing schedule, though it is widely believed that the prospects of the fuel-thirsty, expensive to run HSS fast-craft service are likely to be at an end of an era.

Last month negotiations over the core issue of harbour fees were held between Stena Line and Dun Laoghaire Harbour Company. It is understood that the annual fee of €6.5m was dropped to €2m. The board of the harbour company has given a 'conditional green light' of a new ferry contract to Stena Line to run the service for the next two years with an option of a third year.

The service closed for its seasonal break earlier this year on 5 January with the 'Lynx' going into temporary lay-up at Holyhead's inner harbour to join the HSS Stena Explorer. The HSS had been 'wintering' at the port since September sailings were taken over by the Lynx.

Earlier this month the Stena Lynx III came to Dun Laoghaire to continue her lay-up period. The 1996 Tasmanian built craft will stay there before resuming seasonal sailings between Rosslare-Fishguard in tandem with the conventional ferry Stena Europe.

In the meantime the craft is berthed at the harbour's two-berth ferry terminal at St. Michaels Wharf. The HSS berth is only designed for this type of fast-craft whereas the other berth now occupied by the Lynx was built originally for conventional ferries but was re-configured last year to suit the fast-craft.

Published in Ferry
Page 2 of 3

About the Irish Navy

The Navy maintains a constant presence 24 hours a day, 365 days a year throughout Ireland’s enormous and rich maritime jurisdiction, upholding Ireland’s sovereign rights. The Naval Service is tasked with a variety of roles including defending territorial seas, deterring intrusive or aggressive acts, conducting maritime surveillance, maintaining an armed naval presence, ensuring right of passage, protecting marine assets, countering port blockades; people or arms smuggling, illegal drugs interdiction, and providing the primary diving team in the State.

The Service supports Army operations in the littoral and by sealift, has undertaken supply and reconnaissance missions to overseas peace support operations and participates in foreign visits all over the world in support of Irish Trade and Diplomacy.  The eight ships of the Naval Service are flexible and adaptable State assets. Although relatively small when compared to their international counterparts and the environment within which they operate, their patrol outputs have outperformed international norms.

The Irish Naval Service Fleet

The Naval Service is the State's principal seagoing agency. The Naval Service operates jointly with the Army and Air Corps.

The fleet comprises one Helicopter Patrol Vessel (HPV), three Offshore Patrol Vessels (OPV), two Large Patrol Vessel (LPV) and two Coastal Patrol Vessels (CPV). Each vessel is equipped with state of the art machinery, weapons, communications and navigation systems.

LÉ EITHNE P31

LE Eithne was built in Verlome Dockyard in Cork and was commissioned into service in 1984. She patrols the Irish EEZ and over the years she has completed numerous foreign deployments.

Type Helicopter Patrol Vessel
Length 80.0m
Beam 12m
Draught 4.3m
Main Engines 2 X Ruston 12RKC Diesels6, 800 HP2 Shafts
Speed 18 knots
Range 7000 Nautical Miles @ 15 knots
Crew 55 (6 Officers)
Commissioned 7 December 1984

LÉ ORLA P41

L.É. Orla was formerly the HMS SWIFT a British Royal Navy patrol vessel stationed in the waters of Hong Kong. She was purchased by the Irish State in 1988. She scored a notable operational success in 1993 when she conducted the biggest drug seizure in the history of the state at the time, with her interception and boarding at sea of the 65ft ketch, Brime.

Type Coastal Patrol Vessel
Length 62.6m
Beam 10m
Draught 2.7m
Main Engines 2 X Crossley SEMT- Pielstick Diesels 14,400 HP 2 Shafts
Speed 25 + Knots
Range 2500 Nautical Miles @ 17 knots
Crew 39 (5 Officers)

LÉ CIARA P42

L.É. Ciara was formerly the HMS SWALLOW a British Royal Navy patrol vessel stationed in the waters of Hong Kong. She was purchased by the Irish State in 1988. She scored a notable operational success in Nov 1999 when she conducted the second biggest drug seizure in the history of the state at that time, with her interception and boarding at sea of MV POSIDONIA of the south-west coast of Ireland.

Type Coastal Patrol Vessel
Length 62.6m
Beam 10m
Draught 2.7m
Main Engines 2 X Crossley SEMT- Pielstick Diesels 14,400 HP 2 Shafts
Speed 25 + Knots
Range 2500 Nautical Miles @ 17 knots
Crew 39 (5 Officers)

LÉ ROISIN P51

L.É. Roisin (the first of the Roisín class of vessel) was built in Appledore Shipyards in the UK for the Naval Service in 2001. She was built to a design that optimises her patrol performance in Irish waters (which are some of the roughest in the world), all year round. For that reason a greater length overall (78.8m) was chosen, giving her a long sleek appearance and allowing the opportunity to improve the conditions on board for her crew.

Type Long Offshore Patrol Vessel
Length 78.84m
Beam 14m
Draught 3.8m
Main Engines 2 X Twin 16 cly V26 Wartsila 26 medium speed Diesels
5000 KW at 1,000 RPM 2 Shafts
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)
Commissioned 18 September 2001

LÉ NIAMH P52

L.É. Niamh (the second of the Róisín class) was built in Appledore Shipyard in the UK for the Naval Service in 2001. She is an improved version of her sister ship, L.É.Roisin

Type Long Offshore Patrol Vessel
Length 78.84m
Beam 14m
Draught 3.8m
Main Engines 2 X Twin 16 cly V26 Wartsila 26 medium speed Diesels
5000 KW at 1,000 RPM 2 Shafts
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)
Commissioned 18 September 2001

LÉ SAMUEL BECKETT P61

LÉ Samuel Beckett is an Offshore Patrol Vessel built and fitted out to the highest international standards in terms of safety, equipment fit, technological innovation and crew comfort. She is also designed to cope with the rigours of the North-East Atlantic.

Type Offshore Patrol Vessel
Length 90.0m
Beam 14m
Draught 3.8m
Main Engines 2 x Wärtsilä diesel engines and Power Take In, 2 x shafts, 10000kw
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)

LÉ JAMES JOYCE P62

LÉ James Joyce is an Offshore Patrol Vessel and represents an updated and lengthened version of the original RÓISÍN Class OPVs which were also designed and built to the Irish Navy specifications by Babcock Marine Appledore and she is truly a state of the art ship. She was commissioned into the naval fleet in September 2015. Since then she has been constantly engaged in Maritime Security and Defence patrolling of the Irish coast. She has also deployed to the Defence Forces mission in the Mediterranean from July to end of September 2016, rescuing 2491 persons and recovering the bodies of 21 deceased

Type Offshore Patrol Vessel
Length 90.0m
Beam 14m
Draught 3.8m
Main Engines 2 x Wärtsilä diesel engines and Power Take In, 2 x shafts, 10000kw
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)

LÉ WILLIAM BUTLER YEATS P63

L.É. William Butler Yeats was commissioned into the naval fleet in October 2016. Since then she has been constantly engaged in Maritime Security and Defence patrolling of the Irish coast. She has also deployed to the Defence Forces mission in the Mediterranean from July to October 2017, rescuing 704 persons and recovering the bodies of three deceased.

Type Offshore Patrol Vessel
Length 90.0m
Beam 14m
Draught 3.8m
Main Engines 2 x Wärtsilä diesel engines and Power Take In, 2 x shafts, 10000kw
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)

LÉ GEORGE BERNARD SHAW P64

LÉ George Bernard Shaw (pennant number P64) is the fourth and final ship of the P60 class vessels built for the Naval Service in Babcock Marine Appledore, Devon. The ship was accepted into State service in October 2018, and, following a military fit-out, commenced Maritime Defence and Security Operations at sea.

Type Offshore Patrol Vessel
Length 90.0m
Beam 14m
Draught 3.8m
Main Engines 2 x Wärtsilä diesel engines and Power Take In, 2 x shafts, 10000kw
Speed 23 knots
Range 6000 Nautical Miles @ 15 knots
Crew 44 (6 Officers)

Ship information courtesy of the Defence Forces

Irish Navy FAQs

The Naval Service is the Irish State's principal seagoing agency with "a general responsibility to meet contingent and actual maritime defence requirements". It is tasked with a variety of defence and other roles.

The Naval Service is based in Ringaskiddy, Cork harbour, with headquarters in the Defence Forces headquarters in Dublin.

The Naval Service provides the maritime component of the Irish State's defence capabilities and is the State's principal seagoing agency. It "protects Ireland's interests at and from the sea, including lines of communication, fisheries and offshore resources" within the Irish exclusive economic zone (EEZ). The Naval Service operates jointly with the Army and Air Corps as part of the Irish defence forces.

The Naval Service was established in 1946, replacing the Marine and Coastwatching Service set up in 1939. It had replaced the Coastal and Marine Service, the State's first marine service after independence, which was disbanded after a year. Its only ship was the Muirchú, formerly the British armed steam yacht Helga, which had been used by the Royal Navy to shell Dublin during the 1916 Rising. In 1938, Britain handed over the three "treaty" ports of Cork harbour, Bere haven and Lough Swilly.

The Naval Service has nine ships - one Helicopter Patrol Vessel (HPV), three Offshore Patrol Vessels (OPV), two Large Patrol Vessel (LPV) and two Coastal Patrol Vessels (CPV). Each vessel is equipped with State of the art machinery, weapons, communications and navigation systems.

The ships' names are prefaced with the title of Irish ship or "long Éireannach" (LE). The older ships bear Irish female names - LÉ Eithne, LÉ Orla, LÉ Ciara, LÉ Roisín, and LÉ Niamh. The newer ships, named after male Irish literary figures, are LÉ Samuel Beckett, LÉ James Joyce, LÉ William Butler Yeats and LÉ George Bernard Shaw.

Yes. The 76mm Oto Melara medium calibre naval armament is the most powerful weapon in the Naval Services arsenal. The 76mm is "capable of engaging naval targets at a range of up to 17km with a high level of precision, ensuring that the Naval Service can maintain a range advantage over all close-range naval armaments and man-portable weapon systems", according to the Defence Forces.

The Fleet Operational Readiness Standards and Training (FORST) unit is responsible for the coordination of the fleet needs. Ships are maintained at the Mechanical Engineering and Naval Dockyard Unit at Ringaskiddy, Cork harbour.

The helicopters are designated as airborne from initial notification in 15 minutes during daylight hours, and 45 minutes at night. The aircraft respond to emergencies at sea, on inland waterways, offshore islands and mountains and cover the 32 counties. They can also assist in flooding, major inland emergencies, intra-hospital transfers, pollution, and can transport offshore firefighters and ambulance teams. The Irish Coast Guard volunteers units are expected to achieve a 90 per cent response time of departing from the station house in ten minutes from notification during daylight and 20 minutes at night. They are also expected to achieve a 90 per cent response time to the scene of the incident in less than 60 minutes from notification by day and 75 minutes at night, subject to geographical limitations.

The Flag Officer Commanding Naval Service (FOCNS) is Commodore Michael Malone. The head of the Defence Forces is a former Naval Service flag officer, now Vice-Admiral Mark Mellett – appointed in 2015 and the first Naval Service flag officer to hold this senior position. The Flag Officer oversees Naval Operations Command, which is tasked with the conduct of all operations afloat and ashore by the Naval Service including the operations of Naval Service ships. The Naval Operations Command is split into different sections, including Operations HQ and Intelligence and Fishery Section.

The Intelligence and Fishery Section is responsible for Naval Intelligence, the Specialist Navigation centre, the Fishery Protection supervisory and information centre, and the Naval Computer Centre. The Naval Intelligence Cell is responsible for the collection, collation and dissemination of naval intelligence. The Navigation Cell is the naval centre for navigational expertise.

The Fishery Monitoring Centre provides for fishery data collection, collation, analysis and dissemination to the Naval Service and client agencies, including the State's Sea Fisheries Protection Agency. The centre also supervises fishery efforts in the Irish EEZ and provides data for the enhanced effectiveness of fishery protection operations, as part of the EU Common Fisheries Policy. The Naval Computer Centre provides information technology (IT) support service to the Naval Service ashore and afloat.

This headquarters includes specific responsibility for the Executive/Operations Branch duties. The Naval Service Operations Room is a coordination centre for all NS current Operations. The Naval Service Reserve Staff Officer is responsible for the supervision, regulation and training of the reserve. The Diving section is responsible for all aspects of Naval diving and the provision of a diving service to the Naval Service and client agencies. The Ops Security Section is responsible for the coordination of base security and the coordination of all shore-based security parties operating away from the Naval base. The Naval Base Comcen is responsible for the running of a communications service. Boat transport is under the control of Harbour Master Naval Base, who is responsible for the supervision of berthage at the Naval Base and the provision of a boat service, including the civilian manned ferry service from Haulbowline.

Naval Service ships have undertaken trade and supply missions abroad, and personnel have served as peacekeepers with the United Nations. In 2015, Naval Service ships were sent on rotation to rescue migrants in the Mediterranean as part of a bi-lateral arrangement with Italy, known as Operation Pontus. Naval Service and Army medical staff rescued some 18,000 migrants, either pulling people from the sea or taking them off small boats, which were often close to capsizing having been towed into open water and abandoned by smugglers. Irish ships then became deployed as part of EU operations in the Mediterranean, but this ended in March 2019 amid rising anti-immigrant sentiment in the EU.

Essentially, you have to be Irish, young (less than 32), in good physical and mental health and with normal vision. You must be above 5'2″, and your weight should be in keeping with your age.

Yes, women have been recruited since 1995. One of the first two female cadets, Roberta O'Brien from the Glen of Aherlow in Co Tipperary, became its first female commander in September 2020. Sub Lieutenant Tahlia Britton from Donegal also became the first female diver in the navy's history in the summer of 2020.

A naval cadet enlists for a cadetship to become an officer in the Defence Forces. After successfully completing training at the Naval Service College, a cadet is commissioned into the officer ranks of the Naval Service as a Ensign or Sub Lieutenant.

A cadet trains for approximately two years duration divided into different stages. The first year is spent in military training at the Naval Base in Haulbowline, Cork. The second-year follows a course set by the National Maritime College of Ireland course. At the end of the second year and on completion of exams, and a sea term, the cadets will be qualified for the award of a commission in the Permanent Defence Force as Ensign.

The Defence Forces say it is looking for people who have "the ability to plan, prioritise and organise", to "carefully analyse problems, in order to generate appropriate solutions, who have "clear, concise and effective communication skills", and the ability to "motivate others and work with a team". More information is on the 2020 Qualifications Information Leaflet.

When you are 18 years of age or over and under 26 years of age on the date mentioned in the notice for the current competition, the officer cadet competition is held annually and is the only way for potential candidates to join the Defence Forces to become a Naval Service officer. Candidates undergo psychometric and fitness testing, an interview and a medical exam.
The NMCI was built beside the Naval Service base at Ringaskiddy, Co Cork, and was the first third-level college in Ireland to be built under the Government's Public-Private Partnership scheme. The public partners are the Naval Service and Cork Institute of Technology (CIT) and the private partner is Focus Education.
A Naval Service recruit enlists for general service in the "Other Ranks" of the Defence Forces. After successfully completing the initial recruit training course, a recruit passes out as an Ordinary Seaman and will then go onto their branch training course before becoming qualified as an Able Body sailor in the Naval Service.
No formal education qualifications are required to join the Defence Forces as a recruit. You need to satisfy the interview board and the recruiting officer that you possess a sufficient standard of education for service in the Defence Forces.
Recruit training is 18 weeks in duration and is designed to "develop a physically fit, disciplined and motivated person using basic military and naval skills" to "prepare them for further training in the service. Recruits are instilled with the Naval Service ethos and the values of "courage, respect, integrity and loyalty".
On the progression up through the various ranks, an Able Rate will have to complete a number of career courses to provide them with training to develop their skills in a number of areas, such as leadership and management, administration and naval/military skills. The first of these courses is the Naval Service Potential NCO course, followed by the Naval Service Standard NCO course and the Naval Service senior NCO course. This course qualifies successful candidates of Petty officer (or Senior Petty Officer) rank to fill the rank of Chief Petty Officer upwards. The successful candidate may also complete and graduate with a Bachelor of Arts in Leadership, Management and Naval Studies in partnership with Cork Institute of Technology.
Pay has long been an issue for just the Naval Service, at just over 1,000 personnel. Cadets and recruits are required to join the single public service pension scheme, which is a defined benefit scheme, based on career-average earnings. For current rates of pay, see the Department of Defence website.