Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Irish naval flagship

Following L.É. Róisín's (P51) visit to St. Petersburg, the Naval Service's OPV is on a three-day stopover in the Estonian capital of Tallinn, writes Jehan Ashmore.
She docked early this morning in the Old City Harbour and was expected to be open to the public over the weekend. L.É. Róisín has also called to the Finnish capital of Helsinki. On Wednesday she will call to Estonia's neighbour Latvia where medical supplies will be delivered in the port of Riga to be transported for the Chernobyl Children's Project in Belarus.
Her visit is part of trade-mission deployment organised by the Irish Government agencies to strengthen economic, cultural and social ties with the Russian Federation and Baltic States.The goodwill visit is not the first undertaken by the Naval Service in this region as the flagship L.É. Éithne also docked in St. Petersburg and the capital of Latvia in June 2003.
Published in Navy

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.