Displaying items by tag: Waterways Ireland
Lough Derg Starboard Marks Change to Green
Waterways Ireland Warning: Grand Canal Sallins Dredging Works
Dredging will commence on the north bank west of town bridge for approx. 200m
Master of vessels should proceed at slow speed and comply with instructions from dredger crew.
Waterways Ireland wishes to thank all boaters for their cooperation in this matter.
Waterways Ireland 2012 Sponsorship Programme Now Open
#INLAND WATERWAYS - Waterways Ireland has announced details of its sponsorship programme for 2012.
Under the scheme, the authority for Ireland's inland waterways provides funding and support to groups, associations, clubs or other appropriate bodies to assist with events that enhance the use of the waterways for recreational purposes.
The sponsorship programme cannot be used to fund or contribute towards capital projects such as acquiring or developing new or existing buildings or infrastructure, nor acquiring or maintaining equipment.
Applications are now being accepted for the 2012 programme, and any interested parties can apply by reviewing the guidelines for eligibility and downloading the application form from the Waterways Ireland website.
The closing date for receipt of completed applications is 13 December 2011 at 3pm. Incomplete or late applications will not be assessed.
For further details contact Damien McWeeney at 071 96 50622 or [email protected].
Waterways Ireland Warning: Shannon Erne Restriction
Search and Recovery Operation Underway at Banagher Bridge
Waterways Ireland request masters of vessels to proceed at slow speed and with minimum wash when in the area to avoid hindering or upsetting the search craft.
Lock and Portumna Bridge Times
Locks.
Weekdays: 0900 to 1230
Sunday: 1000 to 1230
Portumna Bridge.
Weekdays: 0945 1100 1200
Sunday: 1100 1200
View Larger Map
Waterways Ireland Begin Work on the Royal Canal in Dublin
The work which requires the dewatering of the canal will remove sediment and rubbish deposits from the central navigation channel before the construction of a new impervious lining to the canal. All material removed from the canals will be transported to licensed disposal facilities. Restoration of the existing towpath walls will also be undertaken to heritage approved standards.
Environmental surveys have been undertaken in full compliance with the regulatory authorities along with the planned removal of all fish to be carried under licence before onsite work begins.
A Traffic Management Plan will be agreed with Dublin City Council and implemented to keep traffic disruption to a minimum. Works are due to be completed by year end.
To facilitate works, the Royal Canal will be closed to navigation from 19 September 2011. The towpath from Lock 6 to the Liffey Junction Bridge on the north side and the Shandon Park area on the south side of the Canal will be closed for the duration of the contract. Following consultation and agreement with residents, a temporary roadway and bridge will also be constructed to provide access for the Coke Oven Residents through Shandon Park. This access will be suitable for emergency vehicles.
An engineer will be full time in attendance for the duration of the contract to ensure that issues which arise are dealt with in a prompt and efficient manner. For further information on the project please visit the Waterways Ireland web site www.waterwaysireland.org and check out the 'Navigation Information, Planned Works' page.
Dublin Dragon Regatta - Grand Canal Disturbances
Racing will be on the North Side of the outer dock. Masters and owners of vessels operating in Grand Canal Dock should refrain from entering the race course and comply with guidance instructions from race officials.
Waterways Ireland apologises for any inconvenience caused by this restriction and thanks its customers for their cooperation.
Lough Key Triathlon Shannon Warning
Masters of vessels are requested to note the advice of marshals when passing near the course and to proceed at slow speed with minimum wash.
National Canoe Polo Championships - Royal Canal
Waterways Ireland wishes to advise all masters and users of the Royal Canal that the above National Championships will take place in Richmond Harbour on Sat 23rd. and Sun 24th. July.
The following timetable will apply:
Date | Time | Event |
---|---|---|
Fri 22 Jul | 14.00hrs onwards | Course set up |
Sat 23 Jul | 09.00hrs to 13.00hrs | Competitions |
13.00hrs to 14.00hrs | "Harbour open to through traffic | |
14.0hrs to 19.00hrs | Competitions | |
Sun 24 Jul | 09.00hrs to 13.00hrs | Competitions |
13.00hrs to 14.00hrs | "Harbour open to through traffic | |
14.0hrs to 17.00hrs | Competitions |
All vessels will be required to be clear of the harbour by 14.00hrs on Fri 22 July to facilitate the setting up of the course but may return after 17.00 hrs on Sun on completion of the event.Further information may be had from Mr Ciaran Clinton , North Kildare Canoe Club on 00-353-87-8482191.