Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Irish Offshore Operators Association (IOAA)

12th November 2010

Potential Oil-Field off Dalkey

In an update issued last week by Providence Resources, it was revealed that its exploration well located 10-miles off the exclusive Dublin Bay suburb of Dalkey has a presence of potential direct hydrocarbons, according to a report in The Sunday Times.

"It's another evaluation process which is positive, an encouraging tick in the box. But ultimately it's only exploration-it has to be drilled", said Tony O'Reilly, CEO of Providence. "I'm hoping that'll be 2011, as part of our overall multi-basin programme in Ireland. We've a big programme of activity and the Dalkey Island (Prospect) will be part of that", he added.

The advantage of any potential oil find at the Dalkey Prospect is that the block well is in shallow waters up to 25-metres, compared to Providence deeper offshore projects of Dunquin and Spanish Point. Another factor in drilling off Dublin Bay is that operations are cheaper and safer. The naming of the exploration site after Dalkey, reflects the Kish Basin's relative geographical proximity to that particular stretch of coastline, marking the southern approaches to Dublin Port.

The optimism expressed about the Kish Bank Basin exploration and other fields must be put into context based on the previous track record of drilling around the Irish coast. The Irish Offshore Operators'Association (IOAA) has pointed out that the exploration industry has spent some €3 billion on around 130 drill-well testing sites since 1970, to little effect. The cost of a well operation off the west coast is over €50m and with such high investment, only up to two wells are carried out annually. Of the commercially viable wells, just four-fields have been exploited, but all are gas-based.

The IOAA says that there is potential but there needs to be more exploration activity. In 2009, only two bids for exploration licences were made, compared to 350 offers sought in UK waters. The association blames the lack of exploration due to delays experienced at the Corrib field, an absence of infrastructural development and expensive operating costs.

The association says the rewards are great, citing the Department of Energy's estimate of recoverable reserves of 10 billion barrels of oil. At that amount, the figure is 100 times the state's annual energy consumption of both oil and gas.

Published in Coastal Notes

About Safehaven Marine 

Safehaven Marine are designers and builders of FRP Pilot boats, Patrol boats, Crew transfer vessels, Hydrographic survey catamarans, Naval & Military craft and unique custom private motor yachts. All our vessels are built to the highest standards of strength & engineering and are renowned worldwide for their exceptional sea-keeping abilities, we set a new World long-range speed record in 2017 with our own vessel and crew. Established in 1996 we have built over 138 vessels supplied to 27 countries worldwide with over 40 pilot vessels in operation globally, and have become leaders in our field.

Based in Youghal, Co Cork Ireland, Safehaven manufacture our vessels from two modern factories, with all design work carried out in house, and built with our own experienced team of engineers, carpenters, electricians, shipwrights and laminators.

Always at the forefront of new technology and designs we continuously develop our range and push the frontiers of design: In 2020 we aim to set a UIM Transatlantic World record with our unique (patent applied for) new 22m high-speed vessel XSV20

Interceptor 42 pilot boat

The Pilot 42 model built by Safehaven Marine has been delivered to ports worldwide and has proved to be a superb sea boat performing admirably in pilotage operations with all owners extolling its virtues of seakeeping, strength and stability.

L.O.A. (Length overall) 13.2m

L.W.L. (Length along waterline) 11.5m

Length moulded (GRP hull only) 12.7

Beam Moulded (GRP only ex fender) 4.0m

Beam overall (Including fenders) 4.4m

Draft (Depth of hull below waterline) 1.35m

Displacement Lightship 14,500kg

Fully loaded 16,000kg

Fuel capacity 1600 litres

Water capacity 110 litres

Crew capacity 5 persons

Engines Volvo D9 425hp

Gearboxes ZF325

Subdivision 4 x separate watertight compartments

Crew capacity 1-2 crew plus 3- 4 pilots

Classification PRS

Speed 23.5kts fully loaded