Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Germar Companion

#SHIPPING - The transfer of hazardous cargo from the stricken tanker at the entrance to Belfast Lough has been delayed yet again due to winds nearing hurricane strength.

The Belfast Telegraph reports that the Genmar Conpanion - which was redirected to Belfast after reporting a cracked hull en route from Rotterdam to New York - will remain sheltering off the Copeland Islands until the weather improves.

As previously reported on Afloat.ie, the ship-to-ship transfer of 54,000 tonnes of vacuum gas oil was originally scheduled to take place on 31 December last, but the task was pushed back as the receiving ship, BW Seine, was delayed by weather in the North Sea.

It had then been hoped to begin the transfer early yesterday with the receiving ship's arrival, but the strong storm-force winds that have increasingly battered Ireland in the last 36 hours put paid to those plans.

Ship-to-ship transfers can take place in wind speeds of up to 35 knots, but yesterday the wind speed in Belfast Lough was reported as more than double that.

Hugh Shaw, the NI Secretary of State's representative for maritime salvage and intervention, told the Belfast Telegraph: "As soon as we have a window to do the ship-to-ship transfer safely we will take it.

"Winds have been dropping a bit, but it looks unlikely the operation will take place on Wednesday."

Published in Ports & Shipping

#SHIPPING - The transfer of cargo from the damaged oil tanker sheltering at the entrance to Belfast Lough has been posponed for at least two more days.

As previously reported on Afloat.ie, the 228-metre Germar Companion - which is carrying 54,000 tonnes of vacuum gas oil - was redirected to Belfast after reporting a cracked hull en route from Rotterdam to New York.

The merchant vessel has been sheltering off the Copeland Islands since 16 December, where an official examination recommended removal of the cargo.

Today (31 December 2011) had been the scheduled start date for the move of the tanker's hazardous cargo by ship-to-ship tranfer. But the move has been delayed as the second ship, the BW Seine, is still en route to Belfast Lough.

"It is currently in the North Sea and could take another two days before it reaches the vessel and starts to transfer the cargo," a coastguard spokesperson told the Belfast Telegraph.

The transfer will be managed by specialist company Fendercare Marine in the lough, and could take between 24 and 36 hours. Once finished, the Germar Companion will sail into Belfast for repairs.

Published in Ports & Shipping

#SHIPPING - The Irish Times reports that a tanker carrying hazardous cargo has been allowed to berth at Belfast Port after it reported a cracked hull off the north-west coast.

The 228-metre Germar Companion, which is is carrying 54,000 tonnes of vacuum gas oil, was on route from Rotterdam to New York when its crew discovered cracking in its upper deck some 25 miles off Tory Island.

The Air Corps and Naval Service were stood down after the cargo ship was granted permission to berth at Belfast, where its hull will be inspected.

Published in Ports & Shipping

Beneteau 211 sailing in Ireland

A small, fast cruiser/racer – in style very much a miniature Open 60 or early Figaro, the Beneteau First 211 offers high sailing performance for her size, plus simple accommodation for up to four people.
The boat is very dinghy-style to sail, although the keel makes her self-righting, and foam buoyancy renders her unsinkable, according to the French manufacturer.

Designed by Groupe Finot and introduced in 1998 as a replacement model for the 1992 model First 210, the Beneteau First 211 is a small high-performance yacht designed to be simple to sail and take the ground or be trailed. The words' pocket rockets' tend to be used to describe these boats!
The design was revised to become the Beneteau First 21.7 in 2005. All three models, 210, 211 and 21.7, are very similar in style and concept and share many actual components.

The hull of the Beneteau First 211 is solid GRP, with sandwich construction for the deck moulding. There is foam buoyancy at the bow and stern, guaranteeing unsinkability. The ballasted drop keel is raised by a manual jack and allows easy transport of the boat and drying out if required, supported level by the twin rudders.
The sailplan has a non-overlapping jib to keep sheet loads down and a large spinnaker to achieve high speeds downwind. With almost six foot of draught with keel down and twin rudders for control, upwind performance is also excellent.

The design is popular in Ireland's boating capital at Dun Laoghaire Harbour, where up to a dozen race as part of a one-design class in regular Dublin Bay Sailing Club racing. The boats also race for national championship honours annually. The boats are kept on Dun Laoghaire Marina and look all the more impressive as the fleet of pocket rocket racers are all moored together on one pontoon.

At A Glance – Beneteau First 211 Specifications

LOA: 6.2m (20ft 4in)

Draught: 1.8m to 0.65m (5ft 11in to 2ft 2in)

Displacement: 1,100kg (2,200lb)

LWL: 6m (19ft 7in)

ARCHITECT
• Finot Conq et Associés

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Associations

ISA sidebutton
ICRA
isora sidebutton

Featured Marinas

dlmarina sidebutton

Featured Chandleries

CHMarine Afloat logo
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Sailmakers

northsails sidebutton
uksails sidebutton
watson sidebutton

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating