Following receipt of planning permission, Inland Waterways Ireland is progressing with the development of a houseboat facility in Shannon Harbour where the Grand Canal meets the Shannon.

The result will be a serviced mooring facility in Shannon Harbour for 6-8 boats. This will include moorings, area lighting, electricity and water.

A section of the Grand Canal, from the 34th Lock to the 35th Lock inclusive, will be closed to navigation between 1st November 2010 and 14th March 2011 to facilitate the improvement works. The towpaths will also be closed during the period of the works.

The design and commissioning of the work has been undertaken by Waterways Ireland. The tenders are currently being assessed and will be awarded shortly.

Published in Inland Waterways
Waterways Ireland has issued a notice tu users of the Grand Canal on the inland waterways that a section of the canal, extending from the 34th Lock to the 35th Lock inclusive, will be closed to navigation between 1st November 2010 and 14th March 2011 to facilitate the following improvement works to the Shannon Harbour area:

PROVISION OF HOUSE BOAT BERTHING AREA

The works site will extend from Griffith Bridge for approximately 350m eastwards of the bridge. Temporary dams will be constructed in the vicinity of this site. Due to low and/or possibly fluctuating water levels between the site and the 34th Lock, it is strongly advised that boats should not be moored between the site and the 34th Lock. Adequate berthage is available East of the 34th Lock. There will be no pedestrian or vehicular access through the work site. Pedestrian and vehicular entry/exit access will be via the south canal bank at L'Estrange Bridge for the duration of the works.

TRANS-SHIPMENT SHED CANOPY REMOVAL AND ASSOCIATED REMEDIAL WORKS
These works will extend for a period of approximately six weeks from November 1st 2010. Boats will not be permitted to moor in the vicinity of the work site during this period. The work site will extend from the 35th Lock for approximately 125m Eastwards, to a point approximately 15m beyond the Eastern gable of the trans-shipment shed. There will be no vessel mooring in the vicinity of the work site. There will be no pedestrian or vehicular access along the northerly canal bank from Griffith Bridge towards the 35th and 36th Locks for the site work duration.

Published in Inland Waterways
The Grand Canal in Tullamore on Ireland's inland waterways will be closed at Cox's Bridge (near the 27th lock) from Monday, 1st November 2010 to Monday, 1st March 2011 to facilitate bridge repairs by National Roads Authority. 
Published in Inland Waterways

Waterways Ireland has issued a notice to users of the Grand Canal of its intention to carry out new inland waterways works by way of provision of house boat berths at Shannon Harbour, Co.Offaly.

The work site will be from Griffith Bridge to a point approximately 200m eastwards of the bridge. A temporary dam will be constructed in the vicinity of this site which will close the canal to navigation at this location.

The work is expected to commence in Oct 2010 and be completed by Mar 2011. Any owners planning to transit the canal at this time should take into account this closure, say the Waterways body.

 

Published in Inland Waterways

A video clip of youths wakeboarding on the Grand Canal on Ireland's inland waterways while being towed behind a car on the tow path has drawn the ire of water safety experts who say the actions are 'foolhardy' and 'irresponsible'. The youtube stunt is below with comments from viewers that includes one from a David Kilty who says: 'Good stuff lads at least someone is making use of our waterways'. The video has been forwarded to the Inspector of Navigation as Lt Cdr John Leech of Irish Water Safety believes the activity is in breach of the Grand Canal Act. 


Published in Inland Waterways

The 15th Lock on the Grand Canal has been closed to navigation until Tuesday, 13th July in order to carry out emergency repairs to the lock gate. Every effort is being made to restore the lock to service as soon as possible.

Published in Inland Waterways

A route that follows the Grand Canal on the inland waterways being opened today provides access for walkers and cyclists from West Dublin right into Dublin centre. Details of the new route – that cost Euro 25 million – is in this morning's Irish Times by Paul Cullen here.

Published in Inland Waterways
Waterways Ireland have reminded users of the Grand Canal that as part of ongoing developments at Shannon Harbour, the provisions of S.I No. 24/1988: Canals Act, 1986 Bye-law (25, 1 (d)) will be applied on all hard edged moorings in the harbour area with effect from 08 May 2010.  This area is deemed to be between 35th Lock and Griffith Bridge. 

This will ensure that there is a clear channel for navigation at all times and will make for easy access to berthage by visiting vessels wishing to avail of the refurbished facilitates.

Vessels should only moor directly onto quay walls and not double or triple berth.  Alternative berthing is available east of Griffith Bridge.

Vessels should only be moored singly on either side of the canal to permit the safe passage of craft.  Bye-law (25, 1 (b) states that sufficient space must remain so that two vessels can pass at the same time.  Berthage is also available on the north bank between 35th and 36th Lock.

Vessels in contravention of this bye-law will be moved off the area as space becomes available. Vessels without a valid permit will also be moved. 



Published in Inland Waterways
Page 18 of 18

Beneteau 31.7 sailing in Ireland

In Ireland, the Beneteau First 31.7 Ireland One Design Class Association encourages and develop the use of the Beneteau First 31.7 yacht as a one-design keelboat, mainly for racing. 

Each year the association stages national championships with boats coming from different sailing across Ireland. The main centre is Dun Laoghaire Harbour where the bulk of the fleet (15 boats) are based at the National Yacht club but are moored at Dun Laoghaire Marina.

The Beneteau 31.7 boat is not new to Dublin Bay, as boats of this size and type have competed in DBSC in the Cruiser 2 class for some years.

However during the 2006 season, due to their increased numbers, DBSC granted the class its own racing start, thereby facilitating one-design racing for this cruiser/racer. 

Since then it has become one of the biggest one-design keelboat classes on the Bay.

One-design rules were drawn up to discourage modifications, maintain a level playing field and set a generally ‘Corinthian’ ethos.

To preserve the cruising dimension, the boat races with cushions aboard.

Numbers entered in DBSC have settled down to approx 15-18 boats, and regular Thursday and Saturday attendances over the season are usually of the order of 14 to 16 boats, reflecting good participation by members. Racing is close and competitive. 

In addition to scratch results, ECHO results are also posted. This combines the best of both worlds, providing one-design racing which the members like, while also providing an incentive and interest in turning out for those boats who may not always approach podium position on scratch.

At A Glance – Beneteau First 31.7 Specifications

L.O.A 9.61 m
Hull length 9.50 m
L.W.L. 8.80 m
Beam 3.23 m
Draught min (Deep draught keel) Cast iron 1.90 m
Ballast weight (Deep draught keel) 1 025 kg
Air draught (max) 13.90 m
Light displacement (EC) 3 750 kg
Fuel capacity 30 l
Freshwater capacity 160 l
Engine power 21 HP

ARCHITECT
• Finot Conq et Associés

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Associations

ISA sidebutton
ICRA
isora sidebutton

Featured Marinas

dlmarina sidebutton

Featured Chandleries

CHMarine Afloat logo
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Sailmakers

northsails sidebutton
uksails sidebutton
watson sidebutton

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating