Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Parade

#navy - Next Saturday a parade will be held in Cork, Echolive reports, to highlight concerns about pay and conditions of members of the Naval Service.

The Parade for Respect and Loyalty will take place at 12 noon on the Grand Parade and is being held to raise support for the Navy members.

It will follow the commissioning tomorrow of the latest Naval ship, the LE George Bernard Shaw, in Waterford tomorrow (today, Sunday, 28 April).

And it comes after a series of parades and actions last year by veteran Defence Force members and the Wives and Partners of the Defence Forces.

One of the organisers, Defence Forces veteran Noel O'Callaghan said: "Our Navy has nine ships, of which two are in dry dock due to a shortage of sailors. To keep the other seven ships at sea they have to change around crews, and have unqualified sailors in specific appointments."

He said the concentration should instead be on pay, allowances and contracts of existing members.

More on the story can be found here.

Published in Navy
Tagged under
An inland waterways Parade of Boats will take place at Castle Island between 12.00pm and 4.00pm and proceed to the Round "O" and from there return to the Broadmedows.

Masters are requested by Waterways Ireland to give the parade a wide berth if not participating in it and to proceed at slow speed and with minimum wash when passing and to heed any advice offered by parade marshals.

 

Published in Inland Waterways

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.