#HSSberthRemoval – Ferry operator, Stena Line announced that is it to apply for planning permission to remove its idle ferry berthing equipment at St Michael’s Pier in Dun Laoghaire Harbour over the coming months.
Back in April, Afloat reported on the future of the specialist berth-linkspan built only for the Stena HSS fast-ferry (which closed services to Holyhead almost a year ago) against the backdrop of the proposed €18m cruise-berth.
The ferry company took an advertisement out in the Dun Laoghaire Gazette which reports of this story which said Stena Line would be submitting a planning application to Dun Laoghaire-Rathdown County Council but, as yet, Dun Laoghaire-Rathdown County Council has not received a planning application for the works.
As part of Stena Line’s planning notice, it has stated that it will remove the east/west walkway, terminal walkways and the supporting steel and concrete structure at St Michael’s Pier.
By removing the berthing equipment at St Michael’s Pier, high-speed sea service (HSS) ferries will no longer be able to berth in the locality, but currently the Stena Line HSS is the only HSS vessel that docks in the berth.
For more on this story and responses from local councillors, click here.