Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Period

Masters and owners on inland waterways have been advised that the winter mooring period ends on Thurs 31 Mar 2011 thereafter Navigation Bye-law No. 17(3) applies i.e. Vessels should not be berthed in the same harbour for longer than the statutory period of five consecutive days or more than a total of 7 days in any one month.
Published in Inland Waterways

About the RS21 International One Design Class

The RS21 International One Design Class is a modern keelboat, which promoters say is 'responsibly designed with performance racing at its heart'.

The powerful rig and distinct chines are balanced by well-mannered boat handling and an ergonomic deck layout to ensure everyone on board has a vital role and ease of use.

The RS21 was developed with sustainability at the core of its design, not only in terms of materials but also considering the carbon footprint in the supply chain, a reduction in single-use plastics and a focus on efficient logistics.

The RS21 International One Design Class is growing from strength to strength, with fleets active over three continents and racing calendars that escalate each year, nationally and internationally. "Removing the arms race and ensuring epically close racing in the RS21 is the future of keelboat racing," said class aficionados.