#collisio – At a hearing today in the County Court Division of South Down, Lindsay Haugh, the Skipper of the fishing vessel Onward N336, was fined a total of £2,500 plus costs of £231 after pleading guilty for failing to keep a proper lookout, according to the UK's Maritime and Coastguard agency.

On 12th September 2014 at approximately midnight the fishing vessel Onward N336 was heading back from fishing grounds in thick fog to its home port of Killkeel when it collided with the Clipper Pennant, a Seatruck Ferries vessel at anchor off Carlingford Lough, Northern Ireland.

Lindsay Haugh, aged 44, from Killkeel pleaded guilty to unlawful conduct endangering ships, structures or individuals off Carlingford Lough, contrary to section 58 of the Merchant Shipping Act 1995, in that he omitted to monitor the recognised VHF channels, omitted to view radar in reduced visibility and omitted to keep a proper look out and as such omissions were deliberate or amounted to a breach, or neglect of duty.

In passing sentence His Worship District Judge King said, "Haugh fully accepted his responsibility and pleaded guilty at the first opportunity.

"Sea collisions are a serious responsibility. You as captain at sea are responsible for the boat, the crew and other persons at sea.

This is a serious matter and thankfully there was no serious damage or loss of life."

David Carlisle, Consultant Surveyor at the Maritime & Coastguard Agency (MCA) said: "This was a serious avoidable incident. Mr Haugh did not keep an effective watch in what was serious reduced visibility, nor did he observe the warning signals sounded from the Clipper Pennant."

Published in Fishing

#GENMAR – After delays due to bad weather, the operation to remove 54,304 tonnes of Vacuum Gas Oil from the merchant vessel Genmar Companion is expected commence imminently (6th January).

Both ships are currently being manoeuvred together by tugs and are being held side- by-side 1.5miles out in Belfast Lough. The cargo is transferred from one to the other using specialist equipment.

The operation to berth, make lines secure and conduct final checks will take several hours before the actual transfer of the oil begins.

The operation to offload the cargo to the tanker BW Seine is expected to take between 24 and 36 hours. For the duration of the operation there will be a one- mile exclusion zone around the Genmar Companion and BW Seine to give the tugs a safe working area.

Published in Ports & Shipping
Tagged under
#RESCUE - The crew of a fishing vessel were rescued from a life raft last night after their fishing vessel 'Moyuna' ran aground at the entrance to Ardglass Harbour.

The 15 metre vessel was returning from a fishing trip when it hit the rocks. With the vessel listing at 30 degrees they broadcast a mayday alert on Channel 16 before the four crew took to the life raft. They were rescued from there by another fishing vessel 'The Three Coins'.

All four crew were brought ashore at Ardglass Harbour safe and well where the South Down Coastguard Rescue Team met them. The damage to the 'Moyuna' is now being assessed.

Belfast Coastguard Watch Manager Alan Pritchard said:
"The crew did exactly the right thing in calling for assistance and taking to the life raft to wait for help to reach them.

"The MAIB have been informed and they will be investigating the circumstances that led to tonight's grounding. MCA's surveyors are also aware."

Published in Fishing
#FISHING – The skipper of Grimsby based fishing vessel 'Karen', that grounded on rocks at Ardglass in Northern Ireland, has pleaded guilty to the charge of endangering his ship and crew.

On 3rd January 2011 the UK registered fishing vessel 'Karen' was returning from a day's fishing in the Irish Sea when it grounded on the rocks at the North entrance to the port of Ardglass.

The vessel asked for urgent assistance from the Coastguard and the lifeboat from Portaferry was requested to launch to their aid. Because the weather was fair they were able to bring the crew ashore to Ardglass and to put pumps aboard the stricken vessel. The boat was later re-floated as the tide rose, however it sustained serious damage to the bow and keel.

At the Magistrate's Court in Downpatrick on 7th November 2011, skipper Simon Wills pleaded guilty of failing to properly navigate his vessel and to employing crew who were not qualified and did not meet the requirements of the fishing vessel safety training regulations

Mr Wills was fined a total of £600 and ordered to pay £1,250 to the RNLI.

On summing up the Magistrate Brian Archer said,
"It was fortunate that no one was injured."

Captain Bill Bennett, Area Operations Manager (Survey and Inspection) Belfast, for the MCA stated that

"This was a serious breach of the fishing vessel safety training regulations and once again reminds all fishermen of the need to ensure everyone onboard is properly qualified and to safely navigate his vessel and to maintain a lookout at all times.  All breaches of the Maritime Regulations are taken seriously by the Maritime and Coastguard Agency."

Published in Fishing

The crew of the Weymouth RNLI relief Severn class all-weather lifeboat Beth Sell assisted a 24 metre sail training vessel with 16 persons onboard that was dismasted South of Portland Bill. The footage taken by crew members iphones and pentax hand held camera. SCROLL DOWN FOR VIDEO

Storms continued to batter Britain and Ireland's coast today as autumn arrived with a roar as forecasters warned the unsettled conditions could last for two weeks.

The Sail Training Vessel's wooden 90ft tall mast broke in half in the force seven winds and the boom, sail and rigging plunged into the choppy 12ft seas.

The crew of the stricken yacht, who were all young adults, were unable to retrieve the stricken mast in the poor conditions and called the Coastguard for help.

The Weymouth RNLI lifeboat rushed to the scene at around 5.35pm yesterday.

None of the sailors were injured in the incident, although some were suffering from seasickness in the rough conditions.

The Daily Mail has more here

Published in Tall Ships
The Minister for Agriculture, Food and the Marine, Simon Coveney TD, is today travelling to Ros an Mhíl to see for himself the operation underway to attempt to refloat the large merchant vessel which ran aground in the harbour early this morning.

Minister Coveney is meeting the Harbour Master and will be briefed by the various agencies who are involved in the operation, including the Irish Coast Guard, Galway County Council and the ship's representatives and will be given a full assessment of the current situation and the contingency arrangements being put in place by the agencies involved for the next few days.

The Minister said "I am anxious to see the situation for myself and to express my support to all involved in this multi-agency operation. While this is obviously a very serious and evolving situation, I have full confidence in the Harbour Master and his staff, the Coast Guard and the other agencies involved to do a fully professional job to address the current situation. The purpose of my visit is to reassure all those concerned that this incident is getting the priority it deserves. I am especially concerned to ensure that all appropriate measures are taken to protect the harbour and the local environment and to avoid any pollution during the very challenging efforts to refloat the vessel. "

The current situation and the weather forecast are being carefully monitored by the Coast Guard. Initial investigations, including evidence from divers, indicate no apparent damage to the vessel and no pollution has been reported. Meanwhile, the vessel's owners are in the process of organising tugs to help move it from its current position.

Published in Ports & Shipping
Two fishermen were brought to safety this evening by the RNLI All-weather lifeboat (ALB) from Dun Laoghaire when their 10-metre vessel broke-down East of Dalkey Island.

The pair anchored their boat as a precaution and awaited the arrival of the lifeboat that was already at sea on a routine exercise less than two miles away.

A towline was passed to the vessel and was taken to safety and brought alongside at Dun Laoghaire.

Related Safety posts

RNLI Lifeboats in Ireland


Safety News


Rescue News from RNLI Lifeboats in Ireland


Coast Guard News from Ireland


Water Safety News from Ireland

Marine Casualty Investigation Board News

Marine Warnings

Published in RNLI Lifeboats

Waterways Ireland has reminded all Masters and users of the Grand Canal on Ireland's inland waterways that it intends to move vessels double or tripled berthed on the Grand Canal and Shannon Harbour that contravene the five day rule.

The enforcement of SI No. 24/1988: Canals Act, 1986 Bye Law (25 ,1 (d)) applies to all hard edged moorings in the harbour area with effect from 17th March 2011.

At Tullamore this area is deemed to be between White Hall Bridge and Waterways Ireland Offices.

At Shannon Harbour The area is deemed to be between 35th Lock Eastwards to Griffith Bridge.

This enforcement will clear the channel for navigation and facilitate the movement of both visiting and Shannon Harbour based vessels. Alternative berthing is available upstream of Griffith Bridge. Boats should only be moored singly on either side of the canal to permit the safe passage of craft. Bye Law (25, 1 (b) states that sufficient space must remain so that two vessels can pass at the same time. Berthage is also available on the North Bank between 35th and 36th Lock.

Vessels in contravention of this bye-law will be moved East or West of the area as space becomes available. Non permitted vessels will also be moved.

This enforcement will facilitate the movement of visiting vessels. Vessels should only moor directly onto quay walls and not double and triple berth. Alternative berthing is available on the main line.

Vessels in contravention of this bye-law will be moved onto the main line. Non permitted vessels will also be moved.

Owners and Masters of vessels are requested to assist in this enforcement in order to open the area to more vessels and facilitate the proper use of the harbour.

Published in Inland Waterways
Masters and owners on inland waterways have been advised that the winter mooring period ends on Thurs 31 Mar 2011 thereafter Navigation Bye-law No. 17(3) applies i.e. Vessels should not be berthed in the same harbour for longer than the statutory period of five consecutive days or more than a total of 7 days in any one month.
Published in Inland Waterways
A search for a missing 18 year old boy that was launched after his friends feared he had fallen from Central Pier was stood down at 01.50 this morning after he was found hiding in the crew accommodation of a nearby fishing vessel.

The call came in at 23.40 from a member of the marina staff after the boy's two friends had told him that all three of them had climbed over the gate into the pier, but that their friend had not come back and they were concerned that he must have fallen into the water.

Belfast Coastguard sent the Bangor Coastguard Rescue Team to begin a search, as well as requesting the launch of the Bangor RNLI lifeboat. Members of the Police, Ambulance and Fire Service are also on scene.

At 01.50, the boy was found hiding in a compartment in the crew accommodation of a fishing vessel near the pier, and the search was stood down.

Belfast Coastguard Watch Manager Alan Pritchard said:

"This group of three boys had been at a birthday party in the town before climbing the gate this evening to access the pier.  Incidents such as these remind of us of the dangers of being in proximity to the water when you have been drinking alcohol – be it going swimming, or walking along cliffs or piers.  Although on this occasion the boy has been found safe and well, this could easily have been a much more serious incident."

Published in Coastguard

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.